Installation
Boiler installation
Boiler installation
The boiler should be positioned in a
frost-proof boiler room. If the boiler
room is on the roof, the boiler itself may
never be the highest point of the instal-
lation.
When positioning the boiler, please
note the recommended minimum clea-
rance in the picture. When the boiler is
positioned with less free space, mainte-
nance activities will be more difficult.
Once the boiler is in the correct positi-
on, the wooden blocks (1) should be
removed and the adjustable feet (2)
(with vibration absorption dampers)
should be adjusted to the right height.
Water and gas connections should be
done after mounting the feet, as they
affect the exact height of all connecti-
ons.
10
1
2 2
Summary of Contents for Bypass R600
Page 2: ......
Page 34: ......
Page 35: ...Betriebsanleitung für die autorisierte Fachkraft R 600 07 2010 DOC3070 12099579 ...
Page 66: ......
Page 98: ......
Page 119: ...21 21 Bedienung Description du display Programmation ...
Page 130: ......
Page 131: ...Istruzioni per l uso solo per il tecnico autorizzato R 600 07 2010 DOC3070 12099579 ...
Page 151: ...21 Guida all uso Descrizione del display Programmazione ...
Page 162: ......
Page 163: ......