Commissioning
Water and hydraulic system
13
Water quality
The system should be filled with water
with a PH value between 8,0 and 9,5.
The chloride value of the water should
not exceed 50 mg/l. Entry of oxygene
by diffusion should be prevented at all
times. Damage to the heat exchanger
because of oxygene diffusion will not
be taken under warranty.
Boiler output
[kW]
Max. sum of alkaline earths
[mol/m
3
]
Max. total hardness
[dºH]
50 - 200
2.0
11.2
200 - 600
1.5
8.4
Concentrate
Ca(HCO
3
)
2
Capacity of installation Q (kW)
150 200 250 300 400 500 600
mol/m
3
dºH
Maximum water (re)fill volume V
max
[m
3
]
≤
0.5
≤
2.8 - - - - - - -
1.0 5.6 - - - - - - -
1.5 8.4 3 4 5 6 8 10
12
2.0 11.2 3 4 5 6 6.3 7.8
9.4
2.5 14.0 1.9 2.5
3.1 3.8 5.0 6.3 7.5
≥
3.0
≥
16.8 1.6 2.1 2.6 3.1 4.2 5.2 6.3
Minimum operating
pressure
[bar]
Flow tempe-
rature
[ºC]
> 1.5
90
> 1.0
80
Water pressure
Open the valves to the system. Check
the water pressure in the system. If the
water pressure is too low (see table
below), increase the pressure up to at
least the minimum required water
pressure in the table.
Filling can be done via the fill and drain
valve (2) on the return connection (1) of
the boiler.
1
2
Hydraulic system
Check if the boiler is hydraulically con-
nected to the system in such way, that
water flow can be secured at all times
during burner operation. The water flow
is supervised by the water flow switch
in the boiler and a lack of flow will lead
to a direct burner stop and lockout of
the boiler.
Commissioning of the boiler should be
carried out by authorized personnel
only. Failure to respect this condition
makes the guarantee void. A protocol
of the commissioning should be filled
out (see end of this chapter for example
of commissioning protocol).
This chapter explains the commissio-
ning of the boiler with the standard boi-
ler controller. When an additional sys-
tem controller is installed, please refer
to its manual for commissioning the
controller.
In installations with higher water volu-
mes, it’s necessary to respect the maxi-
mum filling and additional volumes with
corresponding hardness values as sta-
ted in the german VDI2035 standard. In
the table you can find the nominal va-
lues for filling and additional water for
the R600 according to the the VDI2035.
The table at the left gives an indication
of the relation between the water quali-
ty and the maximum water filling volu-
me during the lifetime of the boiler.
Consult the original text of the VDI2035
for more detailed information.
Summary of Contents for Bypass R600
Page 2: ......
Page 34: ......
Page 35: ...Betriebsanleitung für die autorisierte Fachkraft R 600 07 2010 DOC3070 12099579 ...
Page 66: ......
Page 98: ......
Page 119: ...21 21 Bedienung Description du display Programmation ...
Page 130: ......
Page 131: ...Istruzioni per l uso solo per il tecnico autorizzato R 600 07 2010 DOC3070 12099579 ...
Page 151: ...21 Guida all uso Descrizione del display Programmazione ...
Page 162: ......
Page 163: ......