![elco Bypass R600 Operation And Installation Manual Download Page 17](http://html1.mh-extra.com/html/elco/bypass-r600/bypass-r600_operation-and-installation-manual_2377070017.webp)
Commissioning
Prepare boiler for first startup
15
1
M
H
B
C
D E F
I
L
G
A
Legend:
A On/off
switch
B Return
(ESC)
C Room temperature control
D Confirmation
(OK)
E Manual
mode
F Chimney sweeper mode
G Info
mode
H Reset button
I
Operation mode heating zone(s)
L Display
M Operation mode DHW
Preparation for first startup
Open the gas supply;
Enable the power supply to the boiler;
Switch on the boiler with the on/off
switch (1);
Make sure the boiler is in standby
mode (
K
);
Check the pump operation: make
sure the pump runs in the right
direction;
Release all air from the pump motor.
It‘s recommended to put the boiler on
50% load after the first startup, as this
is the best starting point to do a proper
combustion analysis. This can be done
with the following procedure:
Push button I >3 Sek, the boiler goes
into controller Stopp mode.
Push the Info button (G), the actual
boiler load (%) appears in the display;
Choose „set up“ (confirm with OK
button), now the boiler load can be
changed by rotating the wheel (C)
and confirming the 50% setting with
the OK button.
After checking the combustion values
(see next page), the controller Stopp
mode can be stopped by pushing the
control mode button (I) >3 Sek.
Summary of Contents for Bypass R600
Page 2: ......
Page 34: ......
Page 35: ...Betriebsanleitung für die autorisierte Fachkraft R 600 07 2010 DOC3070 12099579 ...
Page 66: ......
Page 98: ......
Page 119: ...21 21 Bedienung Description du display Programmation ...
Page 130: ......
Page 131: ...Istruzioni per l uso solo per il tecnico autorizzato R 600 07 2010 DOC3070 12099579 ...
Page 151: ...21 Guida all uso Descrizione del display Programmazione ...
Page 162: ......
Page 163: ......