Installing the mounting rack
Flat roof type E: Outdoor / flat roof assembly using mounting
rack with adjustable angle of inclination.
Determine fastening points
taking into consideration the following:
•
The collector panel should be orient-
ed to face southward.
•
The collector panel should not be
shaded at any time.
•
The interconnecting piping should be
kept as short as possible and be rout-
ed directly to the pump assembly and
heat storage tank.
•
In order to minimize wind load, panels
should not be installed directly at the
edge of the roof.
Minimum clearance: 1.2 m;
More for higher buildings and exposed
locations.
•
The distance between the fastening
points shall be individually calculated
taking into consideration the length of
the manifold
(AURON 15 = 138 cm)
(AURON 20 = 184 cm) and the posi-
tion of the interconnecting plates be-
tween the manifolds and the bottom
rails. Note that a brace cannot be
positioned where the interconnecting
plate is located
F = 12 cm
•
Do not exceed the following
dimensions:
projection
E: 7 to 25 cm
and
maximum distance between
supports
A: 140 cm
The total depth of the mounting frame:
B = 150 cm
(see pages 21 and 22)
Preparing and inspecting the roof
Check the roof for the following:
•
roof does not leak or need repairs;
there are no plans to refurbish the
roof in the immediate future
•
The way the mounting racks are fas-
tened depends on the roof's design
load rating. In some cases this may
require that a structural engineer cal-
culate the requirements, taking into
consideration the relevant snow and
wind loads.
•
When the mounting rack is fastened
to concrete weights, the roof must be
capable of supporting an additional
300 kg/m². Concrete slabs weighing
300 kg shall be used to weigh down
each collector. Use construction pro-
tection mats to protect the roof cover-
ing.
•
If the ballast weight is any less, the
panels shall be tied down using wire
rope fastened to fixed hold-down
points. The calculations shall be done
by a structural engineer.
•
The mounting racks may also be bolt-
ed to girders that transmit the load to
walls capable of supporting the total
weight.
•
Concrete slabs, bolts and anchors for
attaching the mounting racks are not
included in the scope of supply and
shall be supplied at site by others.
Basic module with expansion module E 15 DF
Basic module with expansion module E 20 DF
Collector panel length (D):
The total length of the collector panel is
the sum of the lengths of the individual
manifolds.
Length of AURON 15 DF manifold:
138 cm
Length of AURON 20 DF manifold:
184 cm