Taking delivery of the machine
i
Note!
Follow the shipping instructions on the crates!
If the crates have to be opened for inspection by customs officials, always
try to arrange for this inspection to be carried out at storage facilities on
your company’s premises. The packaging will most likely be destroyed
during the customs inspection and the device will then be exposed to air
humidity from the surrounding environment.
The entire shipment must be stored in a dry and (where possible and
necessary) heated room. The shipment must never be stored outdoors.
Protection against rain or intensive sunlight must also be provided.
When taking delivery of the machine, unload the crates and check that no
components are missing.
1.8
Transport, commissioning, repairs
1.8.1
Transport
i
Note!
The machine weighs approximately 350 kg.
The device may only be lifted using suitable lifting gear (fork-lift truck /
low-lift platform truck).
Personnel must not stand under suspended loads.
The lifting fork of the fork-lift truck or the platform of the low-lift platform
truck must be positioned centrally under the bearing frame construction
of the printer.
1.8.2
Commissioning
The machine is installed / assembled by trained technicians from EKRA
Automatisierungssysteme GmbH or authorised representatives.