![ECR International ULTIMATE PF Series Installation Manual And Operating Instructions Download Page 33](http://html1.mh-extra.com/html/ecr-international/ultimate-pf-series/ultimate-pf-series_installation-manual-and-operating-instructions_2356159033.webp)
33
TYPICAL VENT SAFETY SWITCH INSTALLATION
This boiler may also be installed with a pressure
switch. For side-wall vented boilers the unit uses a
.35” w.c. pressure switch. It is mounted to the jacket
T
T
OIL-FIRED
Pressure
Switch
Flexible
Tubing
Hose Barb
Connection
Connect the flexible tubing (provided)
from the hose barb on the burner mount-
ing plate to the positive (+) tap on the pres-
sure switch.
using the screws provided and is wired to the T-T
terminals on the Oil Primary for oil-fired boilers
(as
shown below)
.
Summary of Contents for ULTIMATE PF Series
Page 2: ......
Page 16: ...16 BURNER WIRING RIELLO BURNER WIRING...
Page 17: ...17 MULTI ZONE SYSTEM WIRING AND PIPING...
Page 18: ...18 MULTI ZONE SYSTEM WIRING AND PIPING...
Page 19: ...19 PIPING WITH CIRCULATORS MULTI ZONE SYSTEM WIRING AND PIPING...
Page 20: ...20 MULTI ZONE SYSTEM WIRING AND PIPING...
Page 38: ...38 BOILER PARTS...
Page 44: ......