Commissioning
Function
is as follows
:
•
When power is supplied to the boiler for the first time
will
be displayed. If
is shown, press
, for at least 2 seconds
will now be displayed.
•
Press
&
together and hold for at least 6 seconds.
The “
De-Aeration
” Function will be activated & “
On
” showing.
•
The boiler pump will run for up to 10 minutes. For 3-way valve
models the valve will switch between heating & hot water. This
will purge air from the system. The display will show
Gas Type Check
•
Once de-aeration is complete on first fire-up the boiler will light
and operates for 6 or 7 minutes to automatically check the
gas type Gas A (Natural Gas “
NG
”) or Gas E (Liquefied
Petroleum Gas “
LPG
”). The boiler software check the
combustion value against the set value.
will be displayed
alternating the
%
value
of ignition power
and the temperature value °F(°C).
•
On a Gas A (Natural Gas) supply the display shows
for at
least 10 seconds and the boiler is ready for the normal
operation. If the display shows , press
&
together
and hold for at least 4 seconds to exit the function without
saving.
•
On a Gas E (LPG) supply the display show
, press
for
at least 6 seconds to confirm that this is the intended gas type
for the installation
.
If the display shows , press
&
together and hold for
at least 4 seconds to exit the function without saving then
modify
P02=01
as described in the Manual Instructions for the
Installer section “PARAMETERS SETTING”.
•
While the gas type is being identified, the boiler may be noisy.
IF THE BOILER IS TO BE OPERATED ON GAS E (LP) REPLACE THE
EXISTING LABEL WITH THE GAS E LABEL SUPPLIED WITH
TH
IS INSTRUCTION
.
ASSURE FACTORY SUPPLIED CONVERSION
LABEL IS APPLIED TO PRODUCT IF CONVERTING TO LP.
IMPORTANT: Gas type Check
Ensure
the maximum heat exchange to the system
in Heating or DHW mode (DHW request) in order to
avoid the boiler shutoff for overheating.
FUNCTION INTERRUPT
If either De-aeration or Gas Check is interrupted by electrical
power failure is necessary to reactivate the function by
pressing
&
together for at least 6 seconds.
During De-aeration, if the display shows E118 (water low
pressure), open the water filling tap and repressurising the
system to the correct pressure value.
During Gas Type Check, if the display shows E133 (Ignition
Failure), press
button to Reset then press together
&
for at least 6 seconds to restart the function.
During Gas Type Check, if the boiler switch off for
overheating failure is necessary to reactivate the function by
pressing
&
together for at least 6 seconds.
IMPORTANT
: The combustion for this appliance has been
checked, adjusted and pre-set at the factory for operation on
the gas type specified on the appliance data plate.
During the Gas Type Check Function the combustion
ratio will increase for a short time while the gas type is
established.
The display shows the Gas Type Check
IMPORTANT INFORMATION
READ THIS LEAFLET BEFORE COMMISSIONING THE BOILER
IMPORTANT:
Upon
startup
of this
new
boiler
please call
ECR International, Inc. Technical Support
for
installation assistance and registration
.
Technical Support
and Product Registration
Monday
-
Friday
8AM to 6PM Eastern time.
1.800.253.7900
Described below is the procedure to activate the
Commissioning Function w
hich
includes
De-Aeratio
n
Function/Gas
Type Check when power is first supplied to the boiler and the actions required when on a Gas E (LPG) supply.
240011376 REV
D
, [0
8
/
01
/20
21
]
Summary of Contents for Dunkirk DCB-100
Page 2: ...DCC 205...
Page 4: ...DCB 165...
Page 79: ...75 A 2 MODEL 75 100 Heat Only APPENDIX A WIRING DIAGRAMS 240013501 REV A 03 15 2022...
Page 80: ...76 APPENDIX A WIRING DIAGRAMS A 2 MODEL 125 Heat Only 240013501 REV A 03 15 2022...
Page 81: ...77 APPENDIX A WIRING DIAGRAMS A 3 MODEL 165 Heat Only 240013501 REV A 03 15 2022...
Page 82: ...78 APPENDIX A WIRING DIAGRAMS A 1 MODEL 115 Combi 240013501 REV A 03 15 2022...
Page 83: ...79 APPENDIX A WIRING DIAGRAMS A 4 MODEL 150 Combi 240013501 REV A 03 15 2022...
Page 84: ...80 APPENDIX A WIRING DIAGRAMS A 5 MODEL 205 Combi 240013501 REV A 03 15 2022...
Page 85: ...81 NOTES 240013501 REV A 03 15 2022...
Page 86: ...82 NOTES 240013501 REV A 03 15 2022...
Page 121: ...33 PN 240011430 REV Q 03 15 2022 75 100 HEAT ONLY WIRING DIAGRAM MODEL 75 100 HEAT ONLY...
Page 122: ...34 PN 240011430 REV Q 03 15 2022 MODEL 125 HEAT ONLY 125 HEAT ONLY WIRING DIAGRAM...
Page 123: ...35 PN 240011430 REV Q 03 15 2022 MODEL 165 HEAT ONLY 165 HEAT ONLY WIRING DIAGRAM...
Page 124: ...36 PN 240011430 REV Q 03 15 2022 115 COMBI WIRING DIAGRAM MODEL 115 COMBI...
Page 125: ...37 PN 240011430 REV Q 03 15 2022 MODEL 150 COMBI 150 COMBI WIRING DIAGRAM...
Page 126: ...38 PN 240011430 REV Q 03 15 2022 MODEL 205 COMBI 205 COMBI WIRING DIAGRAM...
Page 132: ...44 PN 240011430 REV Q 03 15 2022 LOW WATER CUTOFF DETAIL LOW WATER CUTOFF NO NO YES...
Page 137: ...49 PN 240011430 REV Q 03 15 2022 3 FAULT SOLUTION SECTIONS...