WARNING
Asphyxiation hazard. Carbon monoxide is odorless,
tasteless, clear colorless gas, which is highly toxic.
Carbon monoxide production shall not exceed
400ppm. Failure to follow these instructions could
result in death or serious injury.
WARNING
$VSK\[LDWLRQKD]DUG9HULI\FDSLV¿UPO\SODFHGRQ
combustion analyzer port to prevent CO emission.
Failure to do so could result in death or serious
injury.
9.3
Burner Pressure Adjustment
8QLWKDVÀDPHPRGXODWLRQZLWKWZR¿[HGSUHVVXUHYDOXHV
minimum and maximum. See Nominal Ratings Table 7 and
Figure 19 for adjustments.
Connect pressure gauge to pressure point
“B”
downstream
on gas valve.Turn screw 8½ turns
ඞ
counter clockwise to
open port.
1.
Remove protection cap “D”.
2.
Operate boiler in TEST mode.
3.
Adjust maximum pressure by turning screw “G”
clockwise
ඟ
to increase pressure and counter clockwise
ඞ
to decrease.
4.
Disconnect one of two connectors “C” from modulation
regulator “F” on the gas valve.
5.
Adjust minimum pressure by turning screw “E” clockwise
ඟ
to increase the pressure and counter clockwise
ඞ
to
decrease it.
6.
Turn burner on and off, verify minimum pressure
remains stable.
7.
Reconnect connector “C” detached from modulation
regulator “F” on the gas valve.
8.
Verify maximum pressure has not changed.
9.
Replace protection cap “D”.
10.
To end TEST mode, repeat activation sequence or wait
15 minutes.
11.
Remove pressure gauge. Close port by tigtening screw
ඟ
clockwise.
9.4 To Enter Test Mode/Adjust Heating Power
Press CH+/- buttons at the same time for 5 seconds.
• 3 way valve is in CH position and burner is forced at
100%. Boiler automatically exits test mode after 15
minutes or to exit test mode manually press CH +/-
buttons together for 5 seconds.
• With Ch +/- buttons you can adjust Max power from (0
to 100%)
9.5 Ignition Adjustment
To adjust ignition, switch boiler to TEST mode (See Start
up Procedure). Press DHW buttons to increase or decrease
power (min.= 00, max. = 60). Press
RESET
button within
5 seconds and ignition remains set. Exit
TEST
mode.
24
9 - START UP PROCEDURE
9.1
Fill Boiler With Water And Purge Air
NOTICE
7RPDLQWDLQERLOHUHI¿FLHQF\DQGSUHYHQWERLOLQJ
LQVLGHWKHKHDWH[FKDQJHUÀXVKHQWLUHKHDWLQJ
system until clean.
• Flush heating system, including all heating zones.
• Fill boiler with potable water.
• Fill boiler and system piping with water (or
antifreeze-water solution, if used). See antifreeze
information Section 5.3 page 11. Purge air from
boiler using air vent. Purge air from system piping.
• Inspect system piping and boiler connections.
Repair any leaks immediately.
• Activate all heating zones and calls for heat,
including CH calls and DHW calls (if available).
• Close manual gas shut off valve. Let system run for
30 minutes. When boiler goes into lockout, reset
boiler by pressing “Reset” button until boiler resets.
• Do not open gas shutoff valve until all air is purged
from system.
9.2
Boiler Start-up and Operational Test
1.
Verify air is purged from hydronic piping
2.
System test pumps - verify each pump is
operational
3.
Verify gas piping
•
&RQ¿UPSUHVVXUHWHVW6HHVHFWLRQSDJH
• Visually inspect piping to determine there are no
RSHQ¿WWLQJVRUHQGVDQGDOOYDOYHVDWXQXVHG
outlets are closed and plugged/capped.
• Purge air from piping
• Check piping and connections for leaks immediately
after gas is turned on. Shut off gas supply and
make necessary repairs if leaks found.
4.
Follow OPERATING INSTRUCTIONS to initiate boiler
operation. See section 10.
5.
Inspect combustion air and vent piping. Verify pipe
is not leaking and terminations are unobstructed and
vent gas discharge is not a nuisance or hazard.
6.
Verify boiler operates.
7.
Check control module operation.
8.
&KHFN¿HOGVRXUFHGOLPLWVORZZDWHUFXWRIIVHWFSHU
manufacturer's instructions.
EN
24
EN
Summary of Contents for CCB-150
Page 6: ...Figure 2 Component Listing 6 3 GENERAL VIEW AND MAIN COMPONENTS EN 6 EN...
Page 39: ...KEY 3DUW 1XPEHU Description 4W A01 FE3980B990 CASING CTR 1 39 REPAIR PARTS LIST EN 39 EN...
Page 41: ...41 REPAIR PARTS LIST EN 41 EN...
Page 43: ...43 REPAIR PARTS LIST EN 43 EN...
Page 45: ...45 NOTES EN 45 EN...
Page 46: ...46 NOTES EN 46 EN...
Page 51: ...Figure 2 Liste des l ments 51 FR 3 VUE D ENSEMBLE ET PRINCIPAUX L MENTS...
Page 84: ...CODE R f Description A01 FE3980B990 ENVELOPPE CTR 84 FR LISTE DES PI CES D TACH ES...
Page 86: ...86 FR LISTE DES PI CES D TACH ES...
Page 88: ...88 FR LISTE DES PI CES D TACH ES...
Page 90: ...90 FR REMARQUES...
Page 91: ...91 FR REMARQUES...
Page 92: ...ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com...