![Ecotherm EDRE Operating And Maintenance Instructions Manual Download Page 31](http://html1.mh-extra.com/html/ecotherm/edre/edre_operating-and-maintenance-instructions-manual_2355617031.webp)
31
ECOTHERM
Heat transfer solutions
®
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
7.3.2.5.6 Legionella parameter
at the page „legionella parameter“ the legionella cover can
be adjusted respectively controlled (internal time switch).
(Safety level 1)
legionella co
-
ver: the legio
-
nella cover can
be activated/
deactived here
time: adjust
-
ment at which
time the legio
-
nella cover gets
active
Weekday: adjustment at which weekday
the legionella cover gets active
Maximal continuance of the
legionella cover 1 - 24 hours
(Safety level 1)
7.3.2.5.4 heat build-up time
Adjusting of the follow-up time, for supporting the
cooling of the boiler.
Clamps 1 and 2 of K1 have to be connected
absolutely with a wire jumper or linked at a
telecontrol.
(see schematic diagram at chapter 5.3)
7.3.2.5.5 Legionella temperature
the temperature of the legionella circuit. for avoiding a
growth of legionella in the tank the legionella circuit can
be started via a switch contact inputs X16 extern from the
boiler regulation or from a timer. at closing the inputs X16
the complete boiler will be heated up to 65° C.
Warning: in order to avoid the increased danger of
scalding it is recommended to install a cold water mixing
plant.
additionally to the external activation there is also the possibility to enable the legionella circuit via an integrated time
switch.
8.3.2.5.7 Input limit WW shall level
Safety-reduction of the maximal insertable hot water
temperature
figure 25
figure 26
Control unit