INSTRUCTIONS MANUAL
-39-
NOTE:
Rarely, charging may not run to completion due to pressure balance. In this case, close
the high pressure tap (leaving the low-pressure side open), and switch on the A/C system.
NOTE:
The automatic procedure may be run even if the A/C system is empty. In this case the
machine will begin with the vacuum phase.