29
PLEASE READ THIS MANUAL COMPLETELY BEFORE THE INSTALLATION OF YOUR PELLETS (BIOFUEL) STOVE.
NOT CONSIDERING PRESENT INSTRUCTIONS MAY CAUSE DOMESTIC AND/OR PERSONAL DAMAGES.
QUICK MANUAL FOR START-UP.
The first step consists in connecting the stove to current.
On the display panel, a start-up sequence appears indicating the model of your stove, the version of the
software as well as the last date of revision of the software.
Then, add pellets in the fuel hopper the and close the door.
Once these operations achieved, please make sure the hopper is free from any object that might prevent
combustion – that is, it should contain only the burn pot.
Make sure the glass door is perfectly closed to ensure optimal operation.
Now, the stove can be turned on. At first operation, it is necessary to open the windows as a light smell of
paint might appear.
Press the On button (
) represented by
symbol, the stove will turn on automatically.
This process goes through different phases: ignition, preheating, and normal operation. This is the process
where the flame first appears. The preheating is a completely automatic step during which the stove will reach the
minimum temperature level. The normal functioning step is where the stove is ready to get the temperature that
you will indicate.
In order to increase or decrease the temperature, please push the increase button (
C
) represented by “
“
or the decrease button (
V
) represented by symbol “
” as you wish.
To stop it, please press the off button (
) represented by symbol
; please do not disconnect the stove.
Programming will be done with the MENU button (
), (see user manual).
In any case, and after these brief explanations, it is highly recommended to read the installation and
maintenance manual and the user manual carefully so as to avoid eventual mistakes in the installation and use.
Menu button.
Turning on-off button.
Fuel decreasing button.
Fuel increasing button.
Liquid crystal display (LCD).
Infrared receiver.
Summary of Contents for BREMEN
Page 2: ...1 27 06 2013 P gina 2 Page 28 Page 53 Pagina 73 P gina 98...
Page 3: ...2 MANUAL DE INSTALACI N Y MANTENIMIENTO...
Page 29: ...28 INSTALLATION AND MAINTENANCE MANUAL...
Page 54: ...53 MANUEL D INSTALLATION ET MAINTENANCE...
Page 74: ...73 MANUALE D INSTALLAZIONE E MANUTENZIONE...
Page 99: ...98 MANUAL DE INSTALA O E MANUTEN O...
Page 126: ...125 9 DESPIECE QUARTERING DETAIL DES PI CES ESPLOSO CORPO STUFA CORTES OSLO BREMEN OS BR...
Page 133: ...132 OSLO OS...
Page 134: ...133 BREMEN BR...
Page 140: ...139 13 DESPIECE QUARTERING DETAIL DES PI CES ESPLOSO CORPO STUFA CORTES SUEZ GP 2010...
Page 146: ...145 15 DESPIECE QUARTERING DETAIL DES PI CES ESPLOSO CORPO STUFA CORTES SUEZ INSERT GI 2010...
Page 154: ...153 19 DESPIECE QUARTERING DETAIL DES PI CES ESPLOSO CORPO STUFA CORTES TURBO AIRE TAN 2008...
Page 168: ...167 25 MEDIDAS MEASURES MESURES MISURES MEDIDAS OSLO OS...
Page 170: ...169 27 MEDIDAS MEASURES MESURES MISURES MEDIDAS BREMEN BR...
Page 172: ...171 29 MEDIDAS MEASURES MESURES MISURES MEDIDAS SUEZ GP 2010...
Page 175: ...174 32 MEDIDAS MEASURES MESURES MISURES MEDIDAS SUEZ INSERT GI 2010...
Page 177: ...176 34 MEDIDAS MEASURES MESURES MISURES MEDIDAS TURBO AIRE TAN 2008...
Page 179: ...178 36 MEDIDAS MEASURES MESURES MISURES MEDIDAS VENECIA CP 2012...