![ECOCOACH ecoBatterySystem Technical Manual Download Page 25](http://html.mh-extra.com/html/ecocoach/ecobatterysystem/ecobatterysystem_technical-manual_2353979025.webp)
4
Installation and commissioning
14. Press and hold the white push-button on the master until all LEDs flash in blue.
✓
All the ecoBatteryModules are switched off.
ATTENTION
Check that the ecoBatteryModules are actually switched off!
15. Connect all the ecoBatteryModules to the ecoBatterySystem power cables:
°
Black power cable to black connection
°
Red power cable to red connection
°
The power cables should click audibly into place and fit securely in the notch. Pull on the
connector firmly to check.
16. To be carried out by two people: Refit the control plate.
17. Reattach the cables and connectors to the control plate.
✓
The ecoBatteryModules are installed.
✓
For the next steps, see see chapter 4.4 "Installing the ecoBatterySystem".
INFORMATION
For more information on the ecoBatteryModule, please consult the documentation supplied by LG
Chem.
TM_ecoBatterySystem_2.2_en-UK
21