12. Route throttle linkage and ignition lead assembly behind U-Han
-
dle bracket and clip to drive shaft as shown.
13. Install throttle linkage to carburetor.
14. Check throttle for freedom of movement and that wide open
throttle / low idle extremes are adjusted properly. Consult with
your Echo Dealer for correct adjustment procedure.
15. Connect ignition stop leads.
16. Install air filter and cover
Install Hip Pad (Optional)
1. Attach hip pad to harness as shown.
Balance unit.
a. Put on harness and attach unit to harness.
b. Slide harness clamp (F) up or down until unit balances with
head approximately 2" - 3" from the ground.
c. Tighten harness clamp screw.
INSTALLATION INSTRUCTIONS U-HANDLE KIT
F
3
A
L