ITALIANO
9.2.3 LAYOUT QUADRI FFP 11 AVS ↔ FFP 75 AVS
BUZZ ER
SWITCH
OFF
LAMPS
TEST
L2
L3
L1
A1
A3
A2
1
MIN LEVEL
SUCTION TANK
L1
L3
L2
PHASE
FAILURE
POWER
ON
TERMAL
RELE'
STOP
START
START
STOP
INCREASE
DECREASE
SHIFT
ENTER
EBARA Pumps Europe S.p.A.
Via Campo Sportivo, 30 - 38023 Cles (TN) - Italy
Via Pacinotti, 32 - 36040 Brendola (VI) - Italy
Phone: +39 0444 706811 http:/ /www.ebara.it
PUMP OPERATION
DEMAND
1
!
START
FAILURE
Code n°
Electric Panel
Circ n- 17.006.013.0
POWER SUPPLY 400V ± 10% 3~ 50-60Hz IP55 100KA
FFP 37 AVS
FFP 11 AVS
FFP 18,5 AVS
FFP 22 AVS
FFP 15 AVS
Electric Panel
Code n°
FFP 30 AVS
ACCORDING TO
EN12845
SW1
2
1
ON
XC2
XC2
XC1
!
ON
1
1
2
4
3
DFFRP
L3
L1
L2
U
V
W
P1
3
PE
L2 L3
L1
GL.ADD.
FFSA
10
9
PR.3
PR.1
PR.2
5
6
7
8
1
2
GL.MIN.
START
19