P.87
8. Disconnection and Transportation
WARNING
When the pump has been used for exhausting highly toxic
gases such as arsenic and mercury compounds, be sure to
contact EBARA Corporation before you return the pump.
CAUTION
In the interest of safety during the transportation, disassembly
and cleaning of the pump, be sure to take note of the gases
that have been handled.
Toxic gases may be generated from by-products in the piping or pump in pump
disconnection from the tool piping for repair and replacement or flange removal for
maintenance. Gain relevant information about the process gases from your tool
suppliers, and be sure that the gas concentrations in the work areas are at quarter or
under the acceptable values specified using appropriate measurement equipment.
Without assurance of gas safety, instruct the workers to wear proper personnel
protective equipment if necessary to protect them from gas hazards. The personnel
protective equipment must include at least gloves, safety goggles, and a gas mask.
To disconnect and transport the pump, proceed as follows.
(1)
Stop the pump and replace all gases inside the pump by purging them with
N
2
gas.
(2)
Switch off the power supply to the pump and remove the power and signal
wires.
(3)
After you have fully closed the N
2
regulator remove the N
2
pipe, seal off the
N
2
purge port with a sealing flange.
(4)
Remove the cooling water pipes.
(5)
Remove the vacuum and exhaust pipes and completely seal off the
suction and exhaust ports of the pump with a blind flange or similar seal.
Seal off all process gas discharge points such as the differential port by
using a blind flange.
[ notes ]
Differential port is option.
PM10U
EBARA
CORPORATION
Summary of Contents for EV-S100
Page 10: ...viii LOCATION WARNING LABEL1 PM10U EBARA CORPORATION...
Page 11: ...ix LOCATION WARNING LABEL2 PM10U EBARA CORPORATION...
Page 16: ...xiv PM10U EBARA CORPORATION...
Page 33: ...P 14 3 5 3 Outline Drawing MODEL EV S20 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 34: ...P 15 MODEL EV S20P EV S 20N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 35: ...P 16 MODEL EV S50 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 36: ...P 17 MODEL EV S50P EV S50N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 37: ...P 18 MODEL EV S100 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 38: ...P 19 MODEL EV S100P EV S 100N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 39: ...P 20 MODEL EV S200 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 40: ...P 21 MODEL EV S200P EV S 200N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 41: ...P 22 MODEL EV S20 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 42: ...P 23 MODEL EV S20P EV S 20N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 43: ...P 24 MODEL EV S50 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 44: ...P 25 MODEL EV S50P EV S50N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 45: ...P 26 MODEL EV S100 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 46: ...P 27 MODEL EV S100P EV S 100N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 47: ...P 28 MODEL EV S200 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 48: ...P 29 MODEL EV S200P EV S 200N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 56: ...P 37 EV S20 LOCATION FIXTURE PM10U EBARA CORPORATION...
Page 57: ...P 38 EV S50 LOCATION FIXTURE PM10U EBARA CORPORATION...
Page 58: ...P 39 EV S100 LOCATION FIXTURE PM10U EBARA CORPORATION...
Page 59: ...P 40 EV S200 LOCATION FIXTURE PM10U EBARA CORPORATION...