P.81
CAUTION
The pump will not stop when an WARNING signal is generated.
When pump operation is continued in this condition an ALARM
signal will be generated or a serious breakdown will occur. Be
sure therefore to check the pump in accordance with the
instructions of Section 10. "Troubleshooting" after the process
plant has completed 1 cycle.
CAUTION
When a ALARM signal has been generated in the REMOTE
operating mode, do not start the maintenance tasks until you
have interrupted the external start signal. When the external
ALTERNATE start signal input is maintained, the pump will start
while the ALARM is being reset.
If any abnormal symptoms other than those displayed on the LCD controller
appear, take action in accordance with the instruction of Section 10.
"Troubleshooting".
When the BZ.OFF button is pressed in the BUZZER Enable mode, the buzzer will
stop even during a warning status.
7.3 Vacuum and Exhaust Piping
WARNING
Maintenance on the vacuum and exhaust piping shall be
performed by taking proper action to avoid the dispersion of
inflammable, toxic and/or hazardous substances and to prevent
physical contact with, and absorption of, these substances.
WARNING
The pump and exhaust piping will remain at a high temperature
during operation and for a short time after the pump has
stopped.
Be sure to avoid contact and keep inflammable substances out
of reach.
Do not remove the outer cover during operation.
PM10U
EBARA
CORPORATION
Summary of Contents for EV-S100
Page 10: ...viii LOCATION WARNING LABEL1 PM10U EBARA CORPORATION...
Page 11: ...ix LOCATION WARNING LABEL2 PM10U EBARA CORPORATION...
Page 16: ...xiv PM10U EBARA CORPORATION...
Page 33: ...P 14 3 5 3 Outline Drawing MODEL EV S20 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 34: ...P 15 MODEL EV S20P EV S 20N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 35: ...P 16 MODEL EV S50 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 36: ...P 17 MODEL EV S50P EV S50N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 37: ...P 18 MODEL EV S100 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 38: ...P 19 MODEL EV S100P EV S 100N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 39: ...P 20 MODEL EV S200 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 40: ...P 21 MODEL EV S200P EV S 200N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 41: ...P 22 MODEL EV S20 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 42: ...P 23 MODEL EV S20P EV S 20N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 43: ...P 24 MODEL EV S50 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 44: ...P 25 MODEL EV S50P EV S50N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 45: ...P 26 MODEL EV S100 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 46: ...P 27 MODEL EV S100P EV S 100N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 47: ...P 28 MODEL EV S200 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 48: ...P 29 MODEL EV S200P EV S 200N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 56: ...P 37 EV S20 LOCATION FIXTURE PM10U EBARA CORPORATION...
Page 57: ...P 38 EV S50 LOCATION FIXTURE PM10U EBARA CORPORATION...
Page 58: ...P 39 EV S100 LOCATION FIXTURE PM10U EBARA CORPORATION...
Page 59: ...P 40 EV S200 LOCATION FIXTURE PM10U EBARA CORPORATION...