P.79
7. Maintenance and Inspection
7.1 Internal energies
Following items show internal energies that shall be considered before start
service maintenance.
7.1.1 Power source
This pump is supplied with AC200V power source. Aside from the pump, the
accessory power source locating in the vicinity of the power connectors are
supplied with voltage even when the pump is completely stopped. To conduct
pump maintenance or service, be sure to keep the power supply to the pump
turned off and lock-outed and then unplug the power cable.
7.1.2 Cooling water
This pump is supplied with cooling water at pressure of maximum 0.4 MPa.
Disconnection of the cooling water resulted from improper handling may cause
electrification and unit damage. For service and transportation, unplug the
cooling water connection plugs on the inlet and outlet, and seal off with plastic cap.
The self-sealing plug is used for the cooling water connection plug in these
pumps.
7.1.3 Nitrogen gas
This pump is supplied with nitrogen gas at pressure of maximum 0.7 MPa for
diluting and sealing inside the pump. For service and transportation, close the
supply-source valve to reduce the pressure with the regulator and detach the gas
connection. Close nitrogen port with blank off plug. If the pump has already
operated with process gases, purge the residual gases with nitrogen gas after
stopping the pump operation. Then, conduct maintenance.
PM10U
EBARA
CORPORATION
Summary of Contents for EV-S100
Page 10: ...viii LOCATION WARNING LABEL1 PM10U EBARA CORPORATION...
Page 11: ...ix LOCATION WARNING LABEL2 PM10U EBARA CORPORATION...
Page 16: ...xiv PM10U EBARA CORPORATION...
Page 33: ...P 14 3 5 3 Outline Drawing MODEL EV S20 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 34: ...P 15 MODEL EV S20P EV S 20N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 35: ...P 16 MODEL EV S50 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 36: ...P 17 MODEL EV S50P EV S50N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 37: ...P 18 MODEL EV S100 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 38: ...P 19 MODEL EV S100P EV S 100N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 39: ...P 20 MODEL EV S200 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 40: ...P 21 MODEL EV S200P EV S 200N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 41: ...P 22 MODEL EV S20 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 42: ...P 23 MODEL EV S20P EV S 20N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 43: ...P 24 MODEL EV S50 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 44: ...P 25 MODEL EV S50P EV S50N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 45: ...P 26 MODEL EV S100 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 46: ...P 27 MODEL EV S100P EV S 100N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 47: ...P 28 MODEL EV S200 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 48: ...P 29 MODEL EV S200P EV S 200N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 56: ...P 37 EV S20 LOCATION FIXTURE PM10U EBARA CORPORATION...
Page 57: ...P 38 EV S50 LOCATION FIXTURE PM10U EBARA CORPORATION...
Page 58: ...P 39 EV S100 LOCATION FIXTURE PM10U EBARA CORPORATION...
Page 59: ...P 40 EV S200 LOCATION FIXTURE PM10U EBARA CORPORATION...