3 Installation
3.1 Installation instructions
ZB12-…, ZB32-…
11/16 MN03407004Z-DE/EN
www.eaton.com
39
3 Installation
3.1 Installation instructions
The mechanical and electrical instruction leaflet must be observed.
The instruction leaflet is printed on the inside of the cardboard packaging.
→
ZB12-…/XTOB…BC1, ZB32-…/XTOB…CC1
The AWA2300-2114 instruction leaflet has been renamed to
IL03407015Z as of publication date 10/10.
→
ZB32-38
The IL3407082Z instruction leaflet applies to the ZB32-38…
overload relay.
DANGER
To ensure explosion-proof operation, the motor-protective relay
may only be reset/switched on manually, or automatically via a
control interlock circuit for the motor or electrical machinery,
after the bimetallic release has cooled down.
Resets may be carried out at the installation or by trained
personnel in the control room.
DANGER
Particularly in Ex e applications, an automatic restart must be
prevented after an interruption of the control voltage. This is
prevented safely by means of the latching function of the power
relay.