22
EATON XSTORAGE COMPACT INSTALLATION MANUAL
P-164000907 - March 2022 www.eaton.com
00 Title
13. If necessary, attach the rack to the floor through the base of the rack.
14. Once loaded with batteries, it is not recommended to move the full weight on the casters.
5.1 Before you start
5.2 Install the xStorage Compact unit
1. Install the unit to the installation location. For instructions, refer to Section 4.3
Unpack the xStorage
Compact system.
2. If the bottom front cable gland is used, prepare all cabling that must pass since they are no more accessible when
bottom battery pack is installed.
3. Install the battery packs. For instructions, refer to Section 5.3
Install battery packs.
4. Connect the DC and AC cables to the respective terminal blocks inside the xStorage Compact unit. For information
on the terminals, refer to Section 5.4
AC and DC cabling of the energy storage system.
5. Connect the CAN cables and other interface connections. For instructions, refer to Section 5.6
Communication
interface connections.
5. Installation and cabling
CAUTION
Read and understand this manual before installing the system. Not doing this could lead to system
misuse and wrong installation, which could lead to warranty violation and severe product damage.
This could also lead to unnecessary hazards, potentially exposing the installer to electric shocks,
injuries and death.