User manual SEFELEC 5x Series
26
v1.06
Insulation resistance
Measurement thresholds
Two measurement thresholds adjustable from
100
kΩ to 200
GΩ (or 2
TΩ)
Measurement results according to the thresholds
Low threshold / R.measured / High
threshold
PASS: R.measured >= SB and SH disabled
10 MΩ / 15.4 MΩ/
200 GΩ
PASS: R.measured <= SH and SB disabled
0 kΩ
/ 98.0 MΩ/ 100 MΩ
PASS: R.measured between SB and SH
55 kΩ / 63.2 MΩ/ 80 MΩ
FAIL: R.measured higher than SH
45 kΩ / 110 MΩ/ 75 MΩ
Time delay
PERMANENT
A rise time applies to the test and then the output voltage is equal to the setpoint. The test is
stopped if the user requests to stop the test by pressing the red button on the front panel.
AUTO
In AUTO mode: The test consists of 3 successive phases during which the voltage rises linearly
up to the desired value (Rise), is maintained at the programmed value (Hold) and is then gradual-
ly reduced to 0 (Fall)
Rise and Fall programmable from
0.0 to 9999.0 sec. in steps of 0.1 s.
Hold programmable from
0.1 to 9999.0 sec. in steps of 0.1 s.
Accuracy
+/- 20 msec.
Summary of Contents for SEFELEC 5 Series
Page 131: ...User manual SEFELEC 5x Series 130 v1 06...
Page 205: ...User manual SEFELEC 5x Series 204 v1 06 EU DECLARATION OF CONFORMITY...
Page 206: ...User manual SEFELEC 5x Series 205 v1 06...
Page 207: ...User manual SEFELEC 5x Series 206 v1 06...