For more information visit:
www.EatonElectrical.com
25
MN05013001E
3
Device Operation
Initial power up
X
Before you switch on the device, verify that it is properly
connected to the power supply, to the bus connector and to
the basic unit.
X
Switch on the power supply to the basic unit and the
PROFIBUS-DP expansion unit.
The Power LED of the EZ204-DP is lit. The BUS LED is off (no
communication via PROFIBUS-DP).
The GW message (intelligent station connected) is displayed
on the basic unit.
As soon as the device is integrated in the PROFIBUS-DP
network, the BUS LED is continuously lit (“static”) and the GW
message is statically displayed, also on devices with a
flashing GW message.
If the PROFIBUS-DP unit is factory set, the station address of
the PROFIBUS-DP station must be set.
Basic unit
GW display
EZ700
Flashing
EZ800
Flashing
EZD-CP8..
Flashing
J
Valid data is only transferred via PROFIBUS-DP to the
basic unit if the GW is displayed statically.