EQUIPMENT INSTALLATION
Eaton 9PXTFMR5, 9PXPPDM2, 9PXTFMR11, and 9PXPPDM1 User's Guide
S
P-164000200 Rev 4
9
Tower Setup
C
A
U
T
I
O
N
S
DO NOT install the 9PX PPDMs and 9PX Transformers in a hermetically-closed
environment without any exchange of air.
S
The 9PX PPDMs and 9PX Transformers are heavy (see the Specifications chapter).
A minimum of two people are required to lift the cabinets.
NOTE
The order of a tower installation, from left to right, is the 9PX PPDM or
9PX
Transformer
,
9PX EBM, and the 9PX UPS.
To set up a tower configuration:
1.
Do this only if the UPS is already installed and operating:
Shut
down the UPS before installing a 9PX PPDM or 9PX Transformer.
Refer to shutdown instructions in the appropriate 9PX UPS user's
guide for your system configuration.
NOTE
Eaton recommends a minimum of 150 mm (5.9”) free space behind the UPS rear
panel.
2.
Position the cabinet upright. Turn the Eaton logo to align with the
top of the cabinet. Ensure additional cabinets are upright.
3.
Group the cabinets in the correct order.
NOTE
Joining brackets are required to stabilize the upright cabinets in installations with
two or more cabinets. A joining bracket is provided in the 9PX PPDM or 9PX Transformer
accessory box in the shipping carton.
NOTE
If you are adding a cabinet to an existing tower configuration, only add a single
joining bracket between the 9PX PPDM or 9PX Transformer and the next cabinet in the
configuration.
4.
Locate the joining bracket in the rail kit box.
5.
Align each joining bracket with the adjacent cabinet screw holes
and secure with the supplied screws (see Figure 2).
Summary of Contents for PowerPass 9PXPPDM1
Page 10: ...INTRODUCTION Eaton 9PXTFMR5 9PXPPDM2 9PXTFMR11 and 9PXPPDM1 User s Guide S P 164000200 Rev 4 4...
Page 12: ...SAFETY Eaton 9PXTFMR5 9PXPPDM2 9PXTFMR11 and 9PXPPDM1 User s Guide S P 164000200 Rev 4 6...
Page 50: ...STARTUP Eaton 9PXTFMR5 9PXPPDM2 9PXTFMR11 and 9PXPPDM1 User s Guide S P 164000200 Rev 4 44...