Mounting
www.eaton.com/lightingsystems
Mounting
Mount the Room Controller above the entrance door of the
room being controlled.
Connect any necessary line and low voltage conduit directly
to the Room Controller.
1
2
3
4
5
6
Integration Controls
Adjustable Skylights
Low En
dH
igh En
d
Energy Options
Statu
s
Rese
t
0-10V Gain Adjustmen
t
Dimmer 3
Dimmer 2
Dimmer 1
+
-
-
+
+
-
0-10V Dimming
Blue - EM Line In Blue - EM Loads Out
CAUTION: Bonding between conduit connections is not automatic and must be provided as part of the installation.
Black - Line In White/Black - 120V
N
White/Orange - 277V
N
Blue - Load In Ye
llow - Load 1 Ou
t
Red - Load 2 Out Purple - Load 3 Out
0-10V Dimming Outputs
-
+
Dimmer 3
Dimmer 2
Dimmer 1
-
+
+
-
Energy Options DIP Switch
Demand Response Occupancy
Not Used
1 2
3
4
Default 10%
20%
30%
40%
Occ
Vac (default)
Time
Clock
Alert
Mode
Demand
Response
A/V
Mode
+
-
Integration Controls
+
-
+
-
+
Green
Black
Red
White
Adjustable Skylight
s
Sensors
Receptacle
BMS/Out
Switchpack
QuickConnect Cable
s
Sensors
Slider
Station
Wallstations
-
Emergency
Line Voltage
(RC3DE only)
Line Voltage
Low Voltage
(Class 2)
Load Wiring
CAUTION
Before Connecting Circuits:
1. Connect lighting load wiring directly to the circuit breaker to ensure there are no shorts or miswires.
2. For any 0-10V dimmable loads, separate the purple and gray leads for each zone controlled. All lighting loads should be at
full bright output.
3. Isolate one dimming zone and temporarily connect the purple and gray 0-10V leads together.
4. Verify that the controlled zone dims to its lowest output level, then label the zone wiring for easy identification.
Disconnect the 0-10V leads for the zone under test and then repeat for remaining dimming zones.