UPS CABINET INSTALLATION
Eaton FERRUPS Rack Mount UPS (850 VA–7 kVA) Installation Guide
S
164201425 Rev 1
www.eaton.com/powerquality
48
10.
Verify the slide rails and latches work properly by sliding the UPS
cabinet out approximately 18
I
(46 cm) until the rail latches lock.
Press the rail tabs and slide the UPS cabinet all the way back into
the rack. The cabinet should move smoothly.
C
A
U
T
I
O
N
To prevent electric shock or damage to your equipment, verify that the UPS ON/OFF switch is
in the OFF position before removing the cover.
11.
Remove the UPS top cover (see Figure 30).
Figure 30. Removing the UPS Top Cover
12.
Continue to one of the following sections according to your UPS
configuration:
S
If you have a hardwired UPS, continue to “Electrical Installation”
on page 49.
S
If you have a plug-receptacle UPS with a battery cabinet,
continue to “Battery Wiring” on page 69.
S
If you only have a plug-receptacle UPS cabinet, use bolts to
attach the UPS front panel to the rack and continue to the
startup section in the
Eaton FERRUPS Rack Mount UPS
(850 VA–7 kVA) User's Guide
.
Summary of Contents for FERRUPS
Page 1: ...Powerware Series Eaton FERRUPS Rack Mount UPS Installation Guide...
Page 83: ......
Page 84: ...1642014251 164201425 1 80 z z...