3.5 Standards 

Eaton ATSs are available to meet NFPA 110 for standby power sys-

tems.
Eaton ATS equipment are listed for application by CSA.  In addition, 

Eaton ATSs are listed in the Legacy File LR96245 Master Contract 

163545 by Canadian Standards Association under Standard 22.2 

#178-1978

Section 4: Installation and Wiring

4.1 General

Eaton ATSs are factory wired and tested.  Installation requires solidly 

mounting the enclosed unit and connecting the power cables and 

the auxiliary sensing circuits.  Physical mounting procedures and 

power cable connections are covered in this section.
Once a transfer switch is properly installed and wired, it should be 

mechanically and electrically checked for proper installation and 

operation.  The procedures for these initial mechanical and electrical 

checks are outlined in Section 5 of this manual. 

Warning

BE CErTain THaT THE DEaDFrOnT iS PrOPErLY inSTaLLED BEFOrE THE 

TranSFEr SWiTCH EQUiPMEnT iS PUT inTO SErViCE. THE DEaDFrOnT 

PrOViDES PrOTECTiOn FrOM DangErOUS VOLTagES aT THE LinE anD 

LOaD TErMinaLS WHEn THE EQUiPMEnT iS in OPEraTiOn. FaiLUrE TO 

DO SO COULD rESULT in PErSOnaL inJUrY Or DEaTH.

4.2 Mounting Location

Choose a location that offers a flat, rigid mounting surface capable 

of supporting the weight of the enclosed ATS equipment.  Protect 

the transfer switch at all times against excessive moisture, dust, 

dirt, lint, and corrosive vapours.Check to ensure there are no pipes, 

wires, or other mounting hazards in the immediate mounting area 

that could create a problem.

Carefully remove all packing material from the ATS enclosure at the 

installation site.  Even though an equipment inspection was per-

formed when the equipment was received, make another careful 

inspection of the enclosure and the ATS mechanism as the packing 

material is removed and the enclosure readied for mounting.  Be 

especially alert for distorted metal, loose wires, or damaged compo-

nents.

4.3 Overhead / Underground Service Cable Entrance

The Eaton metered, service entrance rated ATS will accomodate 

either an overhead service cable entrance configuration or an under-

ground one. 

Twin 2-½” hub openings on the top of the enclosure will accept a 

standard Myers type hub. The assembly ships with removable hub 

closure plates installed over these openings.

For underground service entrance installations the ATS comes 

equipped with twin wireways. These provide proper protection of 

the live service cables as they pass through to the utility cable ter-

mination point of the enclosure. Bracketing and fasteners located 

within meter socket section prevent removal of the wireways with-

out first removing the metering section cover. See Figure 6.

In the case of an overhead service entrance installation the wire-

ways may be removed to provide additional working space in the 

enclosure. Once removed the supplied blanking plates must be 

installed to cover the access holes into the metering section. In an 

underground service entrance installation the unused wireway may 

be removed provided the supplied blanking plate is installed to cover 

the access hole.

For an underground service installation the wireway being used is 

removed only to enable the installation of the conduit adapter for the 

service cable. 

nOTE: The wireway must be re-installed prior to feeding the cable through 

the passage. The wireway can not  be installed over cable that has been 

pre-run run through the passage nor can it be removed once the cable has 

been run through the wireway.

4.3.1 Removing The Underground Service Entrance Wireway

Remove the underground service entrance wireway as fol-
lows:

• 

Remove the enclosure door, dead front and metering section cov-

ers;

• 

Locate and remove the screw and “L” shaped bracket at the 

top of the wireway that spans the metering section barrier (See 

Figure 6);

• 

Locate and remove the screw in the retaining tab built into the 

back edge of the wireway. The tab is found in the lower section 

of the enclosure just below the metering section barrier (See 

Figure 7);

• 

With the wireway now free to move, slide the wireway upwards 

into the metering section far enough for the sealing tab on the 

bottom edge of the wireway to clear the slot it was sitting in (See 

Figure 8);

• 

Rotate the bottom end of the wireway inwards towards the cen-

ter of the enclosure. At the same begin lifting the bottom end of 

the wireway away from the back of the enclosure until it will clear 

the enclosure’s bottom edge (See Figure 8).  Pull downwards and 

remove.

Figure 5. Location of wireway “L” retaining brackets.

Retaining 

Bracket

Summary of Contents for EGS Series

Page 1: ...uipment Description 5 4 Installation and Wiring 8 5 Functional Testing 12 6 Adjustments 13 7 Maintenance and Component Replacement 14 Effective January 2014 Instruction Booklet IB0162063EN O M Manual...

Page 2: ...e proceeding If fur ther information is required by the purchaser regarding a particular installation application or maintenance activity please contact an authorized Eaton sales representative or the...

Page 3: ...ear Conversely if connected to the generator power source and the generator power source fails while the utility power source is still unavailable the ATS remains connected to the generator power sour...

Page 4: ...e when it is within its undervoltage setpoint ranges for the nominal voltage setting Connected Connected is defined as when the input is shorted by an external contact or connection Failed or Fails A...

Page 5: ...site and ready to be installed the packaging material can be removed Refer to Section 4 of this manual for specific installation instructions 2 3 Storage Although well packaged this equipment is not s...

Page 6: ...configuration or an under ground one Twin 2 hub openings on the top of the enclosure will accept a standard Myers type hub The assembly ships with removable hub closure plates installed over these ope...

Page 7: ...e lugs sup plied will accommodate the power cables being used Also verify that the cables comply with all local electrical codes Standard ATS equipment as supplied from the factory will accommodate th...

Page 8: ...range number of Cables per Phase 100 14 1 0 AWG 1 200 4 AWG 300 MCM 1 CaUTiOn iMPrOPEr POWEr CaBLE COnnECTiOnS Can CaUSE EXCESSiVE HEaT anD SUBSEQUEnT EQUiPMEnT FaiLUrE ote N Tighten the cable lugs to...

Page 9: ...ector switch to the OFF position to prevent an unwanted generator start Control wiring such as the generator transfer wires and utility sensing must be run in a separate conduit from the power cables...

Page 10: ...ontactor will automatically switch to the UTILITY position WARNING CONTACT WITH ENERGIZED COMPONENTS WILL CAUSE ELECTRICAL SHOCK CAPABLE OF PRODUCING SEVERE PERSONAL INJURY OR DEATH USE EXTREME CAUTIO...

Page 11: ...DEVICE FAILURE TO FOLLOW THIS PROCEDURE COULD CAUSE SEVERE PERSONAL INJURY AND OR DEATH ALWAYS TURN THE utility POWER OFF AND TURN THE generator IF A GENERATOR CONTROL SELECTOR SWITCH TO THE oFF POSI...

Page 12: ...inspection and or maintenance Disconnect the line power from the equipment being serviced by opening next highest disconnect device Make certain that any accessory control power is switched off b Ins...

Page 13: ...IB0162063EN Effective January 2014 O MManualfortheEGSMetered Service EntranceAutomaticTransferSwitchwithRelayControl Eaton Corporation www eatoncanada ca Figure 15 Wiring Diagram for the EGSC ATS Show...

Page 14: ...B0162063EN Effective January 2014 O MManualfortheEGSMetered Service EntranceAutomaticTransferSwitchwithRelayControl Eaton Corporation www eatoncanada ca 7 3 Maintenance Log Date Action Example 01 01 1...

Page 15: ...DEATH ALWAYS TURN THE UTILITY SOURCE 1 POWER OFF AND TURN THE GENERATOR SOURCE 2 CONTROL SELECTOR SWITCH TO THE OFF POSITION BEFORE ATTEMPTING TO REPLACE ANY COMPONENTS NOTICE Apply utility source 1 p...

Page 16: ...thRelayControl Eaton Corporation www eatoncanada ca Figure 16 Dimensions and Plan View of a Service Entrance EGS in 200A 2 2 Hub Openings 5 90 150mm 5 90 150mm 7 81 198mm 36 19 919mm 29 47 749mm 4 69...

Page 17: ...17 Instruction Booklet IB0162063EN Effective January 2014 O MManualfortheEGSMetered Service EntranceAutomaticTransferSwitchwithRelayControl Eaton Corporation www eatoncanada ca Notes...

Page 18: ...ractual agreement between the parties This literature is not intended to and does not enlarge or add to any such contract The sole source governing the rights and remedies of any purchaser of this equ...

Reviews: