![Eaton Cuttler-Hammer Pow-R-Command 100 Instruction Leaflet Download Page 23](http://html1.mh-extra.com/html/eaton/cuttler-hammer-pow-r-command-100/cuttler-hammer-pow-r-command-100_instruction-leaflet_3838355023.webp)
Installation Leaflet
Page 23 Effective: April 2003
Pow-R-Command 100
IL01412003
For More Information visit www.cutler-hammer.com
5-1.2 RELAY PANEL, EXPANSION/
CONTROL CABINET
For Relay Panels, the Network is terminated
directly on the Relay Termination Board. On
the Relay Termination Board, find the
terminal marked Main Network. The terminal
is marked “
IN+
”, “
IN
-“,”
SHLD
”, “
OUT
+”,
“
OUT
-“, “
SHLD
”, “
GND
”,”
GND
”.
For the first panel in the network, connect
End-of-Line Resistor between ‘
IN
+” and
“
IN
-“ terminals. Connect black wire of the
network cable to the “
OUT+
” terminal.
Connect the white wire to the “
OUT-
“
terminal. Connect shield of the cable to the
“
SHLD
” terminal (see Fig. 5-4).
For the panel in the middle of the network,
connect the end of the incoming cable to
the “
IN
+”, “
IN
-“ and “
SHLD
”, and the end of
the outgoing cable to the “
OUT
+”, “
OUT
-“,
and “
SHLD
” terminals (see Fig. 5-5).
For the last panel in the network, connect
the end of the incoming cable to the “
IN+
”,
“
IN-
“, and “
SHLD
” terminals. Connect End-
of-Line Resistor between “
OUT
+” and
“
OUT
-“ terminals. Connect “
SHLD
” terminal
to “
GND
” terminal (see Fig. 5-6).
There can be the systems where Panel-
boards as well as Relay Panels and Control
Cabinets are connected to one Network.
Please use above termination procedures,
appropriate for the application.
Figure 5-5: Typical Middle Panel In The Network
Figure 5-5: Last Panel In The Network
Figure 5-4: First Panel In The Network