5
Manual CEAG CG-Controller for CG 2000/ZB-S
30080001458 (C) July 2016 www.ceag.de
3 Conformity with standards
The operator of the emergency lighting system
is responsible for organising and supervising
this work.
The following information must be specified in
writing and made available at all times:
•
The nature and extent of the work
•
Recording of work results
•
Responsibilities and permits for carrying out
the work
– Which persons may carry out which opera-
tions?
– Which persons are responsible for supervis-
ing the work?
•
Duties of reporting (e.g. in the case of faults or
function tests)
•
Organisational measures when working on the
emergency lighting system.
This may include:
– Duties of information and reporting on the
start, duration and end of the work
– Safety measures while the work is being
carried out: e.g. standby lighting, power sup-
ply isolation and lock-out (e.g. removing the
fuses, key-operated switch, safety signage)
– Safety equipment for the personnel carrying
out the work on the plant
(e.g. suitable work clothing and personal pro-
tection equipment)
– Safety equipment providing protection from
hazards caused by adjacent plant (e.g. safety
grilles, barriers, making safe of roads)
Refer to the sections dealing with target groups
and the use of these operating instructions
under «1 Safety instructions» and under
«4.2 Use as prescribed».
In particular, inspections and safety checks and
their documentation must be carried out by
specially authorised engineering personnel (in
accordance with the national statutes and direc-
tives).
Note:
For modifications to the emergency light-
ing system and the programming, and for
safety inspections, please contact your
local CEAG office or experts of authorised
organisations.
3 Conformity with standards
In conformity with: VDE 0108/10.89,
DIN/VDE 0805/11.93, IEC 950.
Developed, manufactured and tested in
accordance with DIN EN ISO 9001.
CEAG Notlichtsysteme GmbH can accept no
liability and/or give no warranty in respect of
any defects that may occur with the supply
and installation of CEAG emergency lighting
systems and luminaires on the basis of other
standards and regulations which are mandatory
in complete installation packages in conjunction
with CEAG products.