INSTALLATION
Eaton 9390 UPS, 9395 UPS, and 9395 SSBM Sync Control Installation and Operation Manual
S
P-164000052 Rev 2
3-17
Table 3‐4. Eaton 9395 SBM System Control Wiring Interconnections
From SSBM-A
To Sync Control
Function
Note
TB3-6
TB1-4
Bypass Voltage Phase A
14 AWG
Twist Together
TB3-5
TB1-5
Bypass Voltage Phase B
TB3-4
TB1-6
Bypass Voltage Phase C
TB3-3
TB1-13
Output Voltage Phase A
14 AWG
Twist Together
TB3-2
TB1-14
Output Voltage Phase B
TB3-1
TB1-15
Output Voltage Phase C
TB3-10
TB1-16
Bypass Voltage Phase A Return
14 AWG
Twist Together
TB3-9
TB1-17
Bypass Voltage Phase B Return
TB3-8
TB1-18
Bypass Voltage Phase C Return
TB2-1
TB1-22
Transfer to Bypass Disable (24 Vdc)
14 AWG
Twist Together
TB2-3
TB1-23
Transfer to Bypass Disable Return (24 Vdc)
TB2-9*
TB1-26
Sync Control Trouble (24 Vdc) (Optional)
14 AWG
Twist Together
TB2-11*
TB1-27
Sync Control Trouble Return (24 Vdc) (Optional)
TB4-7
TB1-1
On Bypass Common
14 AWG
Twist Together
TB4-8
TB1-2
On Bypass NO
From SSBM-B
To Sync Control
Function
Note
TB3-6
TB1-10
Bypass Voltage Phase A
14 AWG
Twist Together
TB3-5
TB1-11
Bypass Voltage Phase B
TB3-4
TB1-12
Bypass Voltage Phase C
TB3-3
TB1-7
Output Voltage Phase A
14 AWG
Twist Together
TB3-2
TB1-8
Output Voltage Phase B
TB3-1
TB1-9
Output Voltage Phase C
TB3-10
TB1-19
Bypass Voltage Phase A Return
14 AWG
Twist Together
TB3-9
TB1-20
Bypass Voltage Phase B Return
TB3-8
TB1-21
Bypass Voltage Phase C Return
TB2-1
TB1-24
Transfer to Bypass Disable (24 Vdc)
14 AWG
Twist Together
TB2-3
TB1-25
Transfer to Bypass Disable Return (24 Vdc)
TB2-9*
TB1-28
Sync Control Trouble (24 Vdc) (Optional)
14 AWG
Twist Together
TB2-11*
TB1-29
Sync Control Trouble Return (24 Vdc) (Optional)
TB4-7
TB1-1
On Bypass Common
14 AWG
Twist Together
TB4-8
TB1-3
On Bypass NO
* = building Alarm 3. On 9395 SBM screen set building Alarm 3 for "No Action Taken". The default setting for Building Alarm 3 is set for "Inverters Off".