Eaton 9355 Parallel UPS (10/15 kVA) User's Guide 164201601—Rev E0
13
C
Chhaapptteerr 44 U
UP
PS
S S
Syysstteem
m IInnssttaallllaattiioonn
44..11
P
Prreelliim
miinnaarryy IInnssttaallllaattiioonn IInnffoorrm
maattiioonn
WARNING
Installation should be performed only by qualified personnel.
Refer to the following while installing the UPS system:
•
Review
Chapter 3
UPS Installation Plan and Unpacking
, for cabinet dimensions, equipment weight,
wiring and terminal data, and installation notes.
•
Do not tilt the cabinets more than ±10° during installation.
•
Remove conduit landing plates to add conduit landing holes as required.
•
If perforated floor tiles are required for ventilation, place them in front of the UPS.
44..22
U
Unnllooaaddiinngg tthhee U
UP
PS
S C
Caabbiinneett ffrroom
m tthhee P
Paalllleett
The following tools are required for unloading the cabinet(s):
•
15 mm wrench or socket
•
7 mm nut driver or socket
CAUTION
The UPS and EBM are heavy (see
). Unloading the cabinets requires at least two people to safely
remove the cabinets from the pallet.
To unload three-high cabinets or two-high EBMs, proceed to paragraph
Three-High Cabinets or Two-High EBMs
. To unload two-high UPS cabinets, proceed to paragraph
44..22..11
TThhrreeee--H
Hiigghh C
Caabbiinneettss oorr TTw
woo--H
Hiigghh EEB
BM
Mss
To remove a three-high cabinet or a two-high EBM from the shipping pallet:
1.
Remove the two M10 bolts securing the stabilizing bracket to the pallet (see
Summary of Contents for 9355 Series
Page 1: ...p n 164201601 Revision E0 10 15 kVA User s Guide Eaton 9355 Parallel UPS ...
Page 4: ......
Page 10: ...x Eaton 9355 Parallel UPS 10 15 kVA User s Guide 164201601 Rev E0 List of Tables ...
Page 18: ...8 Eaton 9355 Parallel UPS 10 15 kVA User s Guide 164201601 Rev E0 Safety Warnings ...
Page 54: ...44 Eaton 9355 Parallel UPS 10 15 kVA User s Guide 164201601 Rev E0 UPS System Installation ...
Page 68: ...58 Eaton 9355 Parallel UPS 10 15 kVA User s Guide 164201601 Rev E0 Operation ...
Page 72: ...164201601E0 164201601 E0 ...