42
Eaton 9355 Parallel UPS (10/15 kVA) User's Guide 164201601—Rev E0
Figure 38. Typical EBM Installation (2-High Cabinets Shown)
UPS Battery Connector
Rear Ground Strap
EBM Battery
Circuit Breaker
EBM Battery Connector
EBM Cable
UPS Battery Circuit Breaker
8.
Remove the top front covers of all cabinets.
Press and release the handle latch at the bottom of the cover and then lift the cover up and off the cabinet.
9.
Install the remaining ground straps between each cabinet (see
10. Reinstall the top front covers removed in
Hang the top edge of the cover on the cabinet first, then lower the bottom edge and snap into place.
11. Proceed to
to start up the UPS.
NOTE
After UPS startup, ensure maximum battery runtime by configuring the UPS for the
correct number of EBMs (see paragraph
Summary of Contents for 9355 Series
Page 1: ...p n 164201601 Revision E0 10 15 kVA User s Guide Eaton 9355 Parallel UPS ...
Page 4: ......
Page 10: ...x Eaton 9355 Parallel UPS 10 15 kVA User s Guide 164201601 Rev E0 List of Tables ...
Page 18: ...8 Eaton 9355 Parallel UPS 10 15 kVA User s Guide 164201601 Rev E0 Safety Warnings ...
Page 54: ...44 Eaton 9355 Parallel UPS 10 15 kVA User s Guide 164201601 Rev E0 UPS System Installation ...
Page 68: ...58 Eaton 9355 Parallel UPS 10 15 kVA User s Guide 164201601 Rev E0 Operation ...
Page 72: ...164201601E0 164201601 E0 ...