8

Instruction Booklet 

IL70C1080H03

Effective May 2014

Instructions for Field Installing Ground Fault Alarm/Power

Supply Modules into Digitrip 520M Equipped Eaton

Magnum and Magnum DS Circuit Breakers

EATON www.eaton.com

Apply the same current as described above through any two phases 

of the breaker.  The breaker should not trip, and the alarm indicator, 

if one is supplied, should not operate.  Repeat the test using the 

other two combinations of breaker phases (see Figure 11).

Figure 11.  Connection Details for Conducting Single Phase 

Current Tests with the Breaker Removed from the Cell.

 

CAUTION

RESTORE ALL TEMPORARY CONNECTIONS MADE FOR THE PURPOSE 

OF CONDUCTING TESTS TO PROPER OPERATING CONDITIONS BEFORE 

RETURNING THE BREAKER TO SERVICE.

10.4.5  Eaton Test Kit Check

The functions of your newly installed Ground Alarm / Power Supply 

module can also be confirmed with an optional, test kit authorized 

by Eaton.  This device can provide secondary injection currents to 

the ground protection element of the trip unit that simulates cur-

rents from the current transformers.
Follow the detailed instructions of the particular test kit to initiate 

a ground trip and verify the alarm, contact closure and breaker trip 

action.
The test port is located on the front left-hand corner of the Trip Unit.  

To access the port, remove the plexiglass cover from the front of the 

circuit breaker.  Using a small screwdriver, gently pry up on the test 

port cover to remove this item.

Model

Test Kit

Digitrip DT20 family

Test Kit (140D481G02R, 140D481G02RR, 

140D481G03, or G04) with Test Kit Adapter 

8779C02G04

 

CAUTION

BEFORE PLUGGING A TEST KIT INTO THE TEST PORT, PLACE THE LTM 

JUMPER IN THE INACTIVE POSITION.  AFTER TESTING, RETURN THE LTM 

JUMPER TO ITS ORIGINAL POSITION.

 

CAUTION

PERFORMING TESTS WITHOUT THE EATON- APPROVED TEST KIT MAY 

DAMAGE THE DIGITRIP UNIT

 

WARNING

OBSERVE ALL RECOMMENDATIONS, NOTES, CAUTIONS, AND WARNINGS 

RELATING TO THE SAFETY OF PERSONNEL AND EQUIPMENT.  OBSERVE 

AND COMPLY WITH ALL GENERAL AND LOCAL HEALTH AND SAFETY 

LAWS, CODES, AND PROCEDURES.  .

11.0  Standards

The Eaton Digitrip Trip Units are listed by the Underwriters 

Laboratories, Inc.

® 

(UL), UL File E52096, for use in Magnum 

Circuit Breakers.  These same units are also listed by the Canadian 

Standards Association (CSA) under file LR 43556.
All Digitrip units have also passed the IEC 947-2 test program which 

includes radiated and conducted emission testing.  As a result, all 

units carry the CE mark.

Summary of Contents for 70C1081G01

Page 1: ...tion Preparation 3 6 0 Installation Procedure 3 7 0 Mounting the Module 5 8 0 Wiring Harnesses 5 9 0 Reassembly 6 10 0 Post Installation Testing 7 11 0 Standards 8 Effective May 2014 Supercedes April...

Page 2: ...02C83G01 Shown Figure 2 Wiring Diagram for 520M Models and Ground Alarm Power Supply Modules 1 1 Auxiliary Power Ground Alarm When the module is wired as shown in Figure 2 it will provide an auxiliary...

Page 3: ...reparation 5 1 Remove Breaker from Line Ascertain that the breaker is completely powered down during the Ground Alarm Power Supply module installation If you are unsure as to whether or not the unit i...

Page 4: ...hor the steel trip deck plate into the mounting boss Be careful not to damage the Trip Indicator Assembly and Over Current Trip Switch Bell Alarm if your breaker contains this option Note N Observe ho...

Page 5: ...T THAT THE TIE WRAPS ARE TRIMMED AND THAT THE NEW HARNESSES AND EXISTING WIRING BE TUCKED NEATLY BACK INTO THE BREAKER FRAME LOOSE OR STRAY WIRES MIGHT INTERFERE WITH PROPER FIT AND ALIGNMENT OF THE T...

Page 6: ...th the sockets in the cavity The plug should fit with a slight insertion force Now or If the rating plug was left inside the trip unit use a 0 125 3 2 mm wide screwdriver to tighten the M4 screw until...

Page 7: ...following tests 10 4 2 Secondary Injection Test An AC current of 1 Amp input can be injected onto the breaker secondary contacts B 4 and B 5 This will trigger the Ground Alarm indicator to function a...

Page 8: ...test kit to initiate a ground trip and verify the alarm contact closure and breaker trip action The test port is located on the front left hand corner of the Trip Unit To access the port remove the pl...

Page 9: ...Booklet IL70C1080H03 Effective May 2014 Instructions for Field Installing Ground Fault Alarm Power Supply Modules into Digitrip 520M Equipped Eaton Magnum and Magnum DS Circuit Breakers EATON www eat...

Page 10: ...purposes and should not be considered all inclusive If further information is required you should consult an authorized Eaton sales representa tive The sale of the product shown in this literature is...

Reviews: