14 Installation
Unpacking
Thoroughly inspect the equipment and packaging immediately on arrival.
Carefully remove the outer protective shipping materials. Inspect the machine for any
damage that may have occurred during transit. If goods are received short or in
damaged condition, it is important that you notify the carrier’s driver before they leave
your company and
insist
on a notation of the loss or damage across the bill of lading.
Otherwise no claim can be enforced against the transportation company. Please note
that a copy of this document is attached to the outside of every crate.
If concealed loss or damage is discovered,
notify your carrier at once
and request,
insist
, on an inspection. This is absolutely necessary. A concealed damage report must
be made within
ten (10)
days of delivery of shipment.
Unless you do this, the carrier will not entertain any claim for loss or damage. The agent
will make an inspection and grant a concealed damage notation. If you give the
transportation company a clear receipt for the goods that have been damaged or lost in
transit, you do so at your own risk and expense.
We are willing to assist you in every reasonable manner to help you collect claims for
loss or damage. However, this willingness on Eastey’s part does not make Eastey or its
parent or related companies responsible for collections or claims or replacement of
equipment damaged or lost in transit.
Loading and Unloading Instructions
The machine is fully crated on pallets.
A forklift with long forks is required for unloading.
A loading dock must be available at the facility where the Bundling Tunnel is to
be unloaded.