background image

 

11

10) 

TERMS of TRADE, CONDITIONS of SALE and WARRANTY 
STATEMENT 

 
1.

 

East West Engineering (EWE) products are to be used only as indicated.  Misuse or misapplication may 
cause failure resulting in possible property damage or bodily injury. 

2.

 

It is the obligation of the user to ensure EWE products are used in accordance with appropriate Codes 
and System requirements. 

3.

 

All liability for EWE products performance is disclaimed and the warranty will be voided if any of the 
following conditions exist: 

3.1)  the product is used beyond the published or stated rate load limit.  Note: 

ALL

 ratings are for static 

conditions and do not account for dynamic loading such as wind, water or seismic loads, 

3.2)  the product is not properly installed per published or stated instructions, 
3.3)  the loading to the product is not vertical, 
3.4)  the product is deformed or stressed in any way during fitting or installation, 
3.5)  the product is used in a corrosive environment. 

4.

 

All safety regulations required by the user must be observed. 

5.

 

EWE products at the time of dispatch are warranted to be free of defects in material or workmanship.  

NO  OTHER  WARRANTY  EXPRESSED  OR  IMPLIED  SHALL  EXIST  IN  CONNECTION 
WITH  THE  SALE  OR  USE  OF  EWE  PRODUCTS

.    Claims  for  errors,  shortages,  defects  or  non-

conformities ascertainable upon inspection must be made in writing within 15 days after buyer’s receipt 
of  products.    All  other  claims  must  be  made  to  EWE  within  12  months  of  the  date  of  shipment  for 
products  hydraulically  operated  and  within  12  months  for  products  without  hydraulics.    Products 
claimed  nonconforming  or  defective  must  upon  EWE’s  request  promptly  be  returned  for  inspection.  
Claims not made as provided above and within the applicable time period will be barred.  EWE shall in 
no event be responsible if the products have not been used in accordance with the specifications and/or 
recommended procedures.  EWE will, at its option either repair or replace nonconforming or defective 
products for which it is responsible or return to buyer their purchase price.  The foregoing states buyer’s 
exclusive remedy  for any breach of EWE  warranty and  for any claim,  whether  sounding in contracts, 
tort  or  negligence  for  loss  or  injury  caused  by  the  sale  or  use  of  any  product.    Without  limiting  the 
generality  of  the  foregoing  EWE  shall  in  no  way  be  responsible  for  any  loss  of  business  or  profits, 
downtime  or  delay,  labour,  repair  or  material  cost  or  any  similar  or  dissimilar  consequential  loss  or 
damage incurred by the Buyer. 

6.

 

Examine goods immediately upon receipt and advise any damage or shortage to carriers and ourselves 
within 15 days, otherwise  no claim  whatever  will be considered.  Provided advice is  given  within the 
prescribed  time,  we  will  make  good  any  shortage  and  will  repair  or  replace  free  of  charge  goods 
damaged in transit where we are responsible for delivery of the goods. 

7.

 

If goods are not received within 14 days from receipt of invoice please advise us in writing. 

8.

 

If any error is discovered in this invoicing please notify supplying branch at once for correction. 

9.

 

Property and Payment:

 – By acceptance of delivery and retention of the goods it is acknowledged that 

the property of the goods remains  with EWE and that legal title thereto will not pass until payment is 
made  but  that  nevertheless  the  goods  are  at  your  risk  after  delivery.    In  the  event  that  payment  is  not 
made within 30 days of delivery, or other agreed terms, full licence and authority is given to EWE to 
enter any premises where the goods are stored and to recover possession of them.  In the event of the 
sale of the goods prior to payment, the proceeds of sale belong to EWE. 

10.

 

Terms  of  Payment:

  –  Unless  credit  has  been  arranged  strictly  net  cash;  if  credit  has  been  arranged 

payment must be made by the 25

th

 day of the month, following the month appearing in the date on the 

front of this invoice. 

11.

 

East  West  Engineering  reserves  the  right  to  alter  specifications,  designs  and  prices  without 
notification.

 

 
 

Summary of Contents for WP

Page 1: ...5 Risk Control Measures Summary 5 6 Parts List 7 7 Maintenance 8 8 Compliance Plate Information 9 9 Certification Information 10 10 Terms and Conditions 11 Appendix A Attached ALL EAST WEST WORK PLAT...

Page 2: ...vent the Work Platform from moving off the fork arms The Work Platform is fitted with an internally swinging spring loaded door The door is held in the closed position by a fixed stop and is locked vi...

Page 3: ...ions and tighten Note If the rear frame is to be removed often grease the spigot to prevent seizing c Position the forklift with the fork arm engaged into the slippers as shown in Fig 3 1 With the for...

Page 4: ...the load Referring to AS 2359 1 clause 12 3 1 Industrial Trucks used to lift the type WP Work Platform must have capacities equal to or greater than For a counterbalance truck 1825 kg For reach trucks...

Page 5: ...the Risk Control Measures outlined below in Sections 5 are to be observed by the Industrial Truck Operator to ensure all identified hazards relative to using this equipment are eliminated or controll...

Page 6: ...3 1 N The Operator shall stay with the Industrial Truck controls at all times O The Operator shall keep hands and feet clear of controls other than controls in use P The Operator shall keep clear of o...

Page 7: ...103 Rear Frame Part No WP 06 M10 Nut Bolt Washers 2 sets Toggle Pins Part No SP 0024 Bow Catch Part No Downee CAC 22 Gate Frame Part No WP 07 Hinges 100 x 75mm Spring Bracket SP 0161 Torsion Spring SP...

Page 8: ...ng may be required if any damage is noted as this could be an indication of abuse or overloading Regular cleaning makes identification of damage easier Keep maintenance records to ensure safety checks...

Page 9: ...ing Notice refer Fig 8 4 must be legible and clearly visible to the personnel in the Work Platform as required by AS 2359 1 clause 12 3 2 h If damage occurs contact East West Engineering for a replace...

Page 10: ...ian Standards including those listed below AS NZS 1554 1 2011 Structural Steel Welding Welding of Steel Structures AS 2359 1 1995 Powered Industrial Trucks General Requirements AS 2359 2 1985 SAA Indu...

Page 11: ...E will at its option either repair or replace nonconforming or defective products for which it is responsible or return to buyer their purchase price The foregoing states buyer s exclusive remedy for...

Reviews: