ACM-410D-IM (11/12)
Page 10
Installation - Electrical
:
1. After turning “OFF” power to all EarthLinked® and field supplied system components at the
appropriate breakers
remove the front and top panels of the compressor unit cabinet.
2. Reference Figure 5 for compressor unit electrical box. Remove available hole covers from
the front of the electrical box.
Figure 5. Compressor Unit Electircal Box
3. Install fuse holders into existing fuse holes with screws provided. Install fuses in fuse
holders.