![background image](http://html1.mh-extra.com/html/eagle-eye-power-solutions/lb-ac-series/lb-ac-series_user-manual_3280238007.webp)
7
(5) Load/Unload:
Master load switch, press to power on (light will turn on) and load bank
will load/unload according to preset power loading.
(6) Emergency Stop:
In case of an emergency, press this switch to immediately stop all
loading. After resolving the issue, user may rotate the rotary switch clockwise to unlock
and resume loading.
(7) Power setting switches:
Rating specific switches used to increase the load at
various increments, press the desired combination of switches to reach the total load
power needed, and press the
< Load/Unload >
to confirm and turn on.
4.2 Start
(1) Start the device to be tested:
After all cables are properly connected turn on power
to the device ready for testing.
(2) Start the machine:
Flip power switch on to turn on the machine. The unit can be
operated by either the control panel or PC.
(3) Start PC:
For intelligent control, connect to PC and open the supporting data
management software on your computer.
4.3 Select Control
(1) Local control:
The unit can switch between 2 kinds of operation by the
< Control
Mode >
in
the control panel. When the switch is set to
[Local]
, please use the control
panel to operate the machine.
(2) Intelligent Control:
When the switch is set to
[Intelligent]
use the software to
control the machine.
(3) Control interlock:
If the unit is not responding, it may be due to
two interlocking
control settings, check whether the control mode is set correctly on both the unit and the
software. The rest of this chapter focuses on the local control method.
4.4 Load
(1) Start:
Select local control mode and press
< Fan Power Supply >
on the panel to
start the fans. Please ensure the fan is working normally before proceeding.