LB-AC Series Automatic Load Banks 

User Manual 

1 Important Safety Instructions 

Please read the manual before and reference during use of the product

●The load bank should be kept and used in a clean, safe environment. This entails that

the product should be AWAY from environments such as high corrosive, acidic alkaline, 

combustible, and explosive objects   

● Make sure the area is clean and well-ventilated INDOORS. No obstructions are

allowed within 3-5 meters of the device. If outdoor operation is necessary, avoid having 

the unit in sunlight, rain, wind, and any other adverse conditions   

●Connect all cables correctly. This includes properly installing the ground terminal.

Power on the system only when all cables are properly secured 

●Risk of electric shock, do not touch the elements inside the machine when powered on.

● In order to avoid overheating damage, electrical fan is required to continue running for

3-5 more minutes after load testing.

2 Product Overview 

2.1 Introduction 

 

Thank you for purchasing the LB-AC Automatic Load Bank from Eagle Eye Power 

Solutions! Our systems will accurately test output power and load capacity with all kinds 

of generators and generator sets, for each main electrical parameter including the 

dynamic parameters tested. The following manual will describe the operation and 

performance features of the LB-AC Series. If you have any questions or comment, 

please 

contact us

Summary of Contents for LB-AC Series

Page 1: ...es correctly This includes properly installing the ground terminal Power on the system only when all cables are properly secured Risk of electric shock do not touch the elements inside the machine whe...

Page 2: ...Wire 3 Phase 4 Wire Power Factor 1 Load Tolerance each step 5 Load Tolerance overall 3 Control Power 110 220 VAC single phase 50 60 Hz Wire Connection Load bank input busbar or terminal block Control...

Page 3: ...ual control or software control user can preset the power then press load master button Loading is according to preset power to avoid load fluctuation during the power changing Control Pattern User ca...

Page 4: ...and query Test data is saved in the software which can be accessed in the testing data history Graphical display View and print real time or historical testing data curves and graphs as follows 1 Grap...

Page 5: ...n off the corresponding protection function to continue working When the control power cable is connected in incorrect phase sequence the 3 phase fan can still work in good condition 3 Appearance 3 1...

Page 6: ...hould be connected to null line N of power supply and load bank And the yellow color cable is connected to phase L1 of power supply and load bank green cable to phase L2 red cable to phase L3 Please m...

Page 7: ...ch on to turn on the machine The unit can be operated by either the control panel or PC 3 Start PC For intelligent control connect to PC and open the supporting data management software on your comput...

Page 8: ...e 5 kW 10 kW switches to get to 15kW Then press the Load Unload switch If you need to change the loading power please press the power setting switches accordingly You may re combine load profile and p...

Page 9: ...nd combined with K M to kW MW Var reactive power symbol unit Var and combined with K M to kVar MVar VA Apparent power symbol Unit VA and K M combination kVA MVA Hz Frequency Symbol Unit Hertz PF Power...

Page 10: ...of three phase current from top to bottom as A B C phase current 3 Display the power frequency power factor and electric energy in the non set state by pressing F1 and button you can view the followin...

Page 11: ...ombination into kvar Mvar 07 Display of three phase apparent power from top to bottom as A B C phase apparent power display units VA and with k M combined into KVA MVA 08 From top to bottom display vo...

Page 12: ...stances occur the fault and the corresponding alarm indicator lights and alarm engage Protection status loading function is locked Identify the reasons for troubleshooting and once resolved release an...

Page 13: ...telligent control with data management software is accomplished by flipping the selector switch to intelligent The recommended configuration to run data management software is Microsoft Windows 98 200...

Page 14: ...se over the lights to view the protection reasons Comment Field Used for information tips of shortcut keys task detail tips and other information 5 3 Communication Settings After the PC is connected t...

Page 15: ...4 Automatic loading You can set the power and duration of each stage sequentially for continuous loading After clicking Power Distribution Active Power column to set load power Power Factor to set pow...

Page 16: ...Real Data to the right of the Real Data window shown the button changes to Stop Save and the program will start saving this real time data of the test After the test is complete click Stop Save to st...

Page 17: ...files Import Records Click Import button then select the recording which you want to import in the dialog box and click OK Export Records Select the record which you want to export click Export confi...

Page 18: ...e will be printed in the report 4 Parameter List Click Set in the toolbar and select Modify Parameters enter the correct data then click OK This page will be printed in the report 5 Print Report Click...

Page 19: ...put away all the parts do not store cables in the sunlight The plug should be covered Using a dust cover for the machine is recommended If used outdoors the load bank should be covered up by a rainpro...

Page 20: ...under test Components heat will disperse moisture to ensure that the device performance is stable and reliable In areas where the air humidity is high no load running on a regular basis is an effecti...

Page 21: ...roblem Check if the cables are connected properly Check if the voltage is in the normal range if voltage is too low power will be low accordingly Remote control has no response Data transmission line...