![background image](http://html1.mh-extra.com/html/eagle-eye-power-solutions/dcps-frs-2421k/dcps-frs-2421k_operation-manual_3282182015.webp)
15
GUI Log-In using the DEBUG port
1.
With the
Control Module switched ON, connect the DEBUG cable’s USB connector into the
PC/laptop’s USB port and the DEBUG cable’s other end (RJ45 plug) into
the Shelf’s DEBUG port located on the front panel of the Control Module. Note that the
DEBUG cable assembly has a built-in RS232-to-USB adapter with a DB9 connector that
mates with the DB9 connector on the RJ45 cable assembly
-----------------------------------------------------------------------------------------------------------------------------------
Figure 5a. Access, Log-in, Connect
DEBUG port (for GUI)
ON/OFF switch
Figure 5b. DEBUG cable pinmap
Note
: If GUI fails to connect or
load properly during the GUI
Login process, ensure that the
DEBUG cable Is wired as shown
in
Figure 5b
.
Eagle Eye Power Solutions, LLC | 877-805-3377 | www.eepowersolutions.com