
1-3
T O R Q U E C E L L I N S T A L L A T I O N
Main Dyno Power
Version 2
Torque Cell Installation Guide for Model 250i/250iP DynoWare RT Dynammometers
MAIN DYNO POWER
This section describes how to connect and disconnect the power to both the above
ground and in ground dyno.
C
ONNECTING
AND
D
ISCONNECTING
THE
P
OWER
—A
BOVE
G
ROUND
D
YNO
Use the following steps to connect and disconnect power to the above ground dyno.
Always turn the power off when connecting and disconnecting cables.
1
Use the main breaker to turn power on and off to the dyno.
The main breaker is located inside the CPI door. When the handle is in the down
position all power into the dyno is turned off.
2
Disconnect the power plug to ensure all power has been removed from the dyno
before performing certain installation procedures.
Components attached to and within the dynamometer operate with
potentially lethal voltages. The power cord must be disconnected from the
power source before servicing electrical components or wiring.
Figure 1-1: Main Dyno Power—Above Ground Dyno
MC153
main breaker
power plug