Miscellaneous
ICA152-4EN3.pdf
2012-06-12
Unlocking the articulation
1
3
4
2
Fig. Articulation in the open position
1. Locking arm
2. Locking pin
3. Locking stud
4. Locking lug
Remember to unlock the articulation before
operating.
Remember to unlock the articulation before
operating.
Fold the locking arm (1) back and secure it in the
locking lug (4) with the locking stud (3). Insert the
lowermost locking pin (2) fitted with a wire, to secure
the locking stud (3). The locking lug (4) is located on
the tractor frame.
Towing/Recovering
The roller can be moved up to 300 meters (1,000 ft)
using the instructions below.
2
2
1
1
Fig. Propulsion pump
1. Towing valve
2. Locknut
Alternative 1
Short distance towing with the engine running
Depress the emergency/parking brake knob and
temporarily shut off the engine. Chock the drums
to prevent the roller from moving
Depress the emergency/parking brake knob and
temporarily shut off the engine. Chock the drums
to prevent the roller from moving
Turn both towing valves (1) (middle hexagonal nut)
three turns counter clockwise, while holding the
multifunction valve (2) (lowermost hexagonal nut) in
place. The valves are placed on the forward drive
pump.
Start the engine and allow it to idle.
The roller can now be towed and can also be steered
if the steering system is otherwise functioning.
56
Summary of Contents for CA 152
Page 2: ......
Page 9: ...e ICA152 4EN3 pdf 2012 06 12 Steering joint Check 107...
Page 10: ...e ICA152 4EN3 pdf 2012 06 12...
Page 14: ...Introduction ICA152 4EN3 pdf 2012 06 12 4...
Page 18: ...Safety when operating ICA152 4EN3 pdf 2012 06 12 8...
Page 24: ...Special instructions ICA152 4EN3 pdf 2012 06 12 14...
Page 32: ...Technical specifications ICA152 4EN3 pdf 2012 06 12 22...
Page 70: ...Operating instructions Summary ICA152 4EN3 pdf 2012 06 12 60...
Page 72: ...Operating instructions Summary ICA152 4EN3 pdf 2012 06 12 62...
Page 74: ...Preventive maintenance ICA152 4EN3 pdf 2012 06 12 64...
Page 78: ...Maintenance Lubricants and symbols ICA152 4EN3 pdf 2012 06 12 68...
Page 84: ...Maintenance Maintenance schedule ICA152 4EN3 pdf 2012 06 12 74...
Page 90: ...Maintenance 10h ICA152 4EN3 pdf 2012 06 12 80...
Page 96: ...Maintenance 50h ICA152 4EN3 pdf 2012 06 12 86...
Page 102: ...Maintenance 250h ICA152 4EN3 pdf 2012 06 12 92...
Page 106: ...Maintenance 500h ICA152 4EN3 pdf 2012 06 12 96...
Page 112: ...Maintenance 1000h ICA152 4EN3 pdf 2012 06 12 102...
Page 118: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden...
Page 119: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden...