INSTALLATION
4.1
CONTENT RECEPTION AND CONTROL
Upon receipt of the turbine, verify that the packaging is intact or if there are clear signs of damaging due to transport
or storage conditions. If everything is intact, unpack the contents and check them. If packaging shows signs of
damage due to transport or storage conditions, immediately notify the shipping agent and manufacturer.
Always check that the material received corresponds to its bill of lading.
The packaging should be opened taking all precautions to avoid harming people and the contents therein.
4.2
PACKAGING
Depending on the size and based on the mode of transport, the side channel turbine is packaged as follows:
in individual box;
on wooden platform with cardboard cover;
in wooden cage;
in single boxes positioned on pallets with protective film;
The wood for the platforms, pallets and cage can be reused or recycled in compliance with the current legislation in
the country where the turbine is being installed. Other materials such as cardboard, plastic or protective film must
be disposed of in accordance with local regulations.
Do not burn or discard packaging parts in the environment.
4.3
TRANSPORT AND HANDLING
HAZARD
Should the packaging or turbine overturn or fall, it can cause serious harm to personnel.
Never stand under suspended loads.
All transportation, lifting and handling operation must be performed by qualified and experienced
personnel.
It is strictly forbidden to lift the turbine in any way other than that foreseen.
The side channel turbine can be raised and moved using a forklift truck or with lifting systems (ropes, hooks,etc.),
attached to the specific eyelet located on the unit or motor, suitably in line with the weight shown in technical data
table and on the identification plate.
Manual handling and transportation are permitted only in accordance with current regulations.
WARNING
In order to transport the side channel turbine, we recommend you prepare it as shown in the
following paragraph.
4.4
STORAGE
Shut down the intake and side channel turbine discharge with the specific protections.
The turbine has to be stored in its packaging and kept in covered, dry, protected places that are not exposed to bright
sunlight, with temperatures in the range indicated in point 3.3 of this manual.
4.5
ENVIRONMENTAL CONDITIONS
The side channel turbine must be installed and used in a covered and adequately lit location.
The installation area must meet all requirements of height, air circulation as well as meet the requirements imposed
by existing legislation.
Temperature, Humidity and Altitude
The corresponding limit values are shown in the table of the technical specifications (3.3). Please contact the
manufacturer if environmental conditions are different from those prescribed.
Lighting
All areas must be homogeneously and sufficiently lit to ensure all operations included in this manual can be carried
out safely and there should be no shadows, reflections, glare or eye strain.