5.3
Cleaning
Personnel:
Cleaning staff
Protective equipment:
Eye protection
Respirator mask
Protective workwear
Protective gloves
Anti-Static Safety Boots
In addition, also follow the separate oper-
ating instructions of the energy supply
Requirements:
Material-carrying lines are purged.
Material supply system is switched off and
secured against reconnection.
Material-carrying lines are depressurized.
Mains disconnecting device on the technology
cabinet is switched off and secured against
reconnection.
1. Moisten a piece of cloth or a soft brush with
cleaning agent.
2. Damp wipe surfaces.
5.4
Maintenance
5.4.1 Maintenance schedule
Interval
Maintenance work
Semi-annually
Check that screw connections are seated tightly, re-tighten if necessary.
Annually
Replacing material hoses:
5.4.3 “Replacing Material Hose”
Replacing compressed air hoses:
5.4.2 “Replacing Compressed Air Hose”
5.4.2 Replacing Compressed Air Hose
Personnel:
Mechanic
+ additional qualification explosion protection
Protective equipment:
Eye protection
Protective workwear
Protective gloves
Anti-Static Safety Boots
Requirements:
Material supply system is switched off and
secured against reconnection.
Material-carrying lines are depressurized.
Mains disconnecting device on the technology
cabinet is switched off and secured against
reconnection.
Compressed air hose is disconnected from the
atomizer.
Observe separate operating instructions
1. Cut off hose connection.
2. Fix new compressed air hose on the trimmed
hose using adhesive tape.
3. Pull out old compressed air hose from the con-
voluted hose at the foot of the robot.
New compressed air hose is drawn in.
4. Connect hose connection of the new com-
pressed air hose to the atomizer.
Follow label and diagram.
Cleaning and maintenance
03/2019
Atomizer Connection EcoGun - MRS00004EN