17
17
17
RIDGE & BARGE
• Position ridge fl ashing into position ensuring soft edge is on top.
Note ridge will overhang corner fl ashing by approx 20mm.
• Using nine rivets (3 per sheet), rivet ridge to the ribs on roof
sheets.
• Using two rivets, rivet ridge to corner fl ashing.
• Push soft edge down into roof corrogations to prevent water
penetrating under the ridge fl ashing.
• Position barges as shown, using six rivets, rivet barge to ridge and
spouting.
• Rivet underside of barge to underside of spouting.
• Using tinsnips, cut the side of the barge fl ashing fl ush with ridge
fl ashing.
CUT