11
11
11
TIMBER FRAME - ASSEMBLE FRAME
• Stand up back wall frame and one end wall frame.
• Using a 10mm drill, predrill and screw both frames
together using four 100mm tek screws per corner.
(100mm down from top and 100mm up from base
and remaining screws evenly spaced in between.)
• Ensure end wall panels fi t in between front and back
frames.
• Repeat with remaining frames untill all frames are
screwed together.
• Position ridge beam onto top plates, ensuring it is
directly above studs.
• Using two 90mm nails, skew nails to top plate.
• Using four 55mm tek screws, screw bracket to
underside of ridge beam and studs as shown.
• Position frame onto base (either concrete,plywood or
timber fl oor).
• Ensure frame is straight and check that frame is
square by ensuring diagonal measurements are the
same.
• Screw base plate to fl oor using 100mm tek screws or
100mm dyna bolts as shown.
• Using a hand saw, remove base plate between door
studs by cutting fl ush with inside of door studs as
shown.
• (Note - you may choose to leave base plate attached,
if your shed does not have a fl oor).
• If your shed has an optional timber or ply fl oor, attach
door step fl ashing now. Predrill and nail through top
of fl ashing, using three 50mm fl ooring nails
SECURE FRAME TO FLOOR
CUT
CUT
.
.
.
.
.
.
.
..
.
Tek screw/Dynabolts
.