ARBOR INSTALLATION
Option 1
Slide one 24” steel u-channel ground
anchor (part 12) into bottom of each
post. Slide ground anchor until it
meets bottom cross rail. Using 1” self-
tapping white-head screw fasten post
to ground anchor.
Using ground anchor installation layout
drawing (figure 2), dig holes
approximately 16” deep. Set arbor in
holes and level. Back fill with soil
removed from holes. For permanent
installation fill with cement.
Option 2
Using ground anchor installation layout
drawing (figure 2), pound ground
anchors into ground according to
dimensions. When pounding into
ground, use block of wood to prevent
ground anchor from bending.
Slide arbor over ground anchors.
Using 1” self-tapping white-head screw
fasten post to ground anchor.
Option 3
Using ground anchor installation layout
drawing (figure 2), dig holes 16” deep
according to dimensions. Fill with
cement and place ground anchors in
wet cement. Be sure that ground
anchors are straight and in accordance
with dimension of ground anchor
installation layout drawing. Allow
cement to dry. NOTE: There is very
little room for error with this installation
method.
Slide arbor over ground anchors.
Using 1” self-tapping white-head screw
fasten post to ground anchor.
17