background image

Using only one arbor top half from 
step 8, slide one arbor top connector 
tube (part 9) into ends where arbor 
top half is fastened together.  
Connector tube should be inserted 
half way (up to black mark) 

Lay out one arbor top arch half  
(part 8).  Insert four 36¾” rails  
(part 11)  into arch half.  Slide another 
arch half over 36¾” rails. 
 
Using 1½” kappet screws, screw 
together arbor top half.  Be sure that 
all parts are fully inserted before 
securing.  Snap kappet screw caps 
over screw heads.   

 

 

 

 

 

 

 

  REPEAT 

using 

remaining 

 

 

two arbor top arch halves 

  and 

four 

36¾” 

rails. 

Using ¾” kappet screws, fasten both 
connector tubes to arch halves.  Be 
sure connector tube is only inserted 
half way (up to black mark).  Snap 
kappet screw caps over screw heads.   

10 

Summary of Contents for Hartford Arbor

Page 1: ...d Part Description Box Number Qty 1 4 sq x 72 Left Post 1 2 2 4 sq x 72 Right Post 2 2 3 2 sq x 36 Top Bottom Cross Rail 1 4 4 2 sq x 36 Center Cross Rail 1 4 5 x 1 x 59 Outside Vertical Rail 1 4 6 x 1 x 59 Middle Vertical Rail 1 2 7 x 1 x 16 Rail 1 6 8 4 sq Arbor Top Arch Half 1 2 4 9 3 x 6 Arbor Top Connector Tube 2 6 10 Decorative Knuckle 2 6 11 2 sq x 36 Rail 2 8 12 24 U channel Ground Anchor ...

Page 2: ...ertical rail part 5 On each end of assembly slide vertical rails through one center cross rail part 4 Slide center cross rails all the way to 16 rail On each end of assembly insert one 16 rail through middle vertical rail and into outside vertical rails The vertical rails will need to be flexed to slide 16 into open holes Slide center cross rails away from middle 16 rail Center cross rails should ...

Page 3: ...esponding holes of right post Slide left post part 1 onto corresponding holes of assembly Be sure top of posts with 3 pilot holes are at same end of arbor panel Using 1 kappet screws screw together arbor panel Be sure that all parts are fully inserted into the posts before securing Snap kappet screw caps over screw heads REPEAT steps 1 7 for second arbor panel 5 6 7 ...

Page 4: ...s part 11 into arch half Slide another arch half over 36 rails Using 1 kappet screws screw together arbor top half Be sure that all parts are fully inserted before securing Snap kappet screw caps over screw heads REPEAT using remaining two arbor top arch halves and four 36 rails 9 Using kappet screws fasten both connector tubes to arch halves Be sure connector tube is only inserted half way up to ...

Page 5: ...where arbor half was fastened together in step 8 Slide one decorative knuckle part 10 over each connector tube and arch half Slide the knuckle up to the screws fastened in step 10 13 Using kappet screws fasten arch halves to connector tubes to complete arbor top Snap kappet screw caps over screw heads 11 12 ...

Page 6: ...f each post with three pilot holes Connector tube will insert half way resting on cross rail at black mark Using kappet screws fasten connector tubes to posts Snap kappet screw caps over screw heads 16 Join posts with arbor top by inserting connector tubes into free ends of arbor top Using kappet screws fasten arbor top to connector tubes Snap kappet screw caps over screw heads 14 15 ...

Page 7: ...nd anchors into ground according to dimensions When pounding into ground use block of wood to prevent ground anchor from bending Slide arbor over ground anchors Using 1 self tapping white head screw fasten post to ground anchor Option 3 Using ground anchor installation layout drawing figure 2 dig holes 16 deep according to dimensions Fill with cement and place ground anchors in wet cement Be sure ...

Reviews: