background image

Insert free ends of vertical rails into 
corresponding holes of each top/
bottom cross rail (part 3). 

Lay out one right post (part 2).  Insert 
cross rails of assembly into 
corresponding holes of right post.  
Slide left post (part 1) onto 
corresponding holes of assembly.  Be 
sure top of posts with 3 pilot holes are 
at same end of arbor panel. 

Using 1½” kappet screws, screw 
together arbor panel.  Be sure that all 
parts are fully inserted into the posts 
before securing.  Snap kappet screw 
caps over screw heads. 
 
REPEAT steps 1-7 for second arbor 
panel. 

Summary of Contents for Hartford Arbor

Page 1: ...d Part Description Box Number Qty 1 4 sq x 72 Left Post 1 2 2 4 sq x 72 Right Post 2 2 3 2 sq x 36 Top Bottom Cross Rail 1 4 4 2 sq x 36 Center Cross Rail 1 4 5 x 1 x 59 Outside Vertical Rail 1 4 6 x 1 x 59 Middle Vertical Rail 1 2 7 x 1 x 16 Rail 1 6 8 4 sq Arbor Top Arch Half 1 2 4 9 3 x 6 Arbor Top Connector Tube 2 6 10 Decorative Knuckle 2 6 11 2 sq x 36 Rail 2 8 12 24 U channel Ground Anchor ...

Page 2: ...ertical rail part 5 On each end of assembly slide vertical rails through one center cross rail part 4 Slide center cross rails all the way to 16 rail On each end of assembly insert one 16 rail through middle vertical rail and into outside vertical rails The vertical rails will need to be flexed to slide 16 into open holes Slide center cross rails away from middle 16 rail Center cross rails should ...

Page 3: ...esponding holes of right post Slide left post part 1 onto corresponding holes of assembly Be sure top of posts with 3 pilot holes are at same end of arbor panel Using 1 kappet screws screw together arbor panel Be sure that all parts are fully inserted into the posts before securing Snap kappet screw caps over screw heads REPEAT steps 1 7 for second arbor panel 5 6 7 ...

Page 4: ...s part 11 into arch half Slide another arch half over 36 rails Using 1 kappet screws screw together arbor top half Be sure that all parts are fully inserted before securing Snap kappet screw caps over screw heads REPEAT using remaining two arbor top arch halves and four 36 rails 9 Using kappet screws fasten both connector tubes to arch halves Be sure connector tube is only inserted half way up to ...

Page 5: ...where arbor half was fastened together in step 8 Slide one decorative knuckle part 10 over each connector tube and arch half Slide the knuckle up to the screws fastened in step 10 13 Using kappet screws fasten arch halves to connector tubes to complete arbor top Snap kappet screw caps over screw heads 11 12 ...

Page 6: ...f each post with three pilot holes Connector tube will insert half way resting on cross rail at black mark Using kappet screws fasten connector tubes to posts Snap kappet screw caps over screw heads 16 Join posts with arbor top by inserting connector tubes into free ends of arbor top Using kappet screws fasten arbor top to connector tubes Snap kappet screw caps over screw heads 14 15 ...

Page 7: ...nd anchors into ground according to dimensions When pounding into ground use block of wood to prevent ground anchor from bending Slide arbor over ground anchors Using 1 self tapping white head screw fasten post to ground anchor Option 3 Using ground anchor installation layout drawing figure 2 dig holes 16 deep according to dimensions Fill with cement and place ground anchors in wet cement Be sure ...

Reviews: