Dungs 241 484 Instructions Manual Download Page 17

MC • Edition 2022.10 • Nr

. 241 484 R

ev

. -0

17 … 20

Vn [m

3

/h] Erdgas/Natural gas/Gaz Naturel/Gas metano dv = 0,65

Vn [m

3

/h] Erdgas/Natural gas/Gaz Naturel/Gas metano dv = 0,65

Vn [m

3

/h] Luft / Air / Aria dv = 1,00

Ersatzmagnet

Replacement solenoid

Bobine de rechange

Bobina di ricambio

DIN 43 650

 

Filtereinsatz

Filter insert

Elément filtrant

Gruppo filtro 

MBC-300-... 

Set  1  Stück

 

Set    1  pieces

 

Kit    1  pièces

 

Set    1  pezzi

MBC-300-... 

Set  10  Stück

 

Set 10 pieces

 

Kit  10 pièces

 

Set 10 pezzi

MBC-700-... 

Set  1  Stück

 

Set    1  pieces

 

Kit    1  pièces

 

Set    1  pezzi

MBC-700-... 

Set  10  Stück

 

Set 10 pieces

 

Kit  10 pièces

 

Set 10 pezzi

MBC-1200-... 

Set  1  Stück

 

Set    1  pieces

 

Kit    1  pièces

 

Set    1  pezzi

MBC-1200-... 

Set  10  Stück

 

Set 10 pieces

 

Kit  10 pièces

 

Set 10 pezzi

auf Anfrage

on request

sur demande

su richiesta

241 916

241 917

242 072

242 073

245 624

245 625

Ersatzteile / Zubehör

Spare parts / Accessories

Pièces de rechange / access.

Parti di ricambio / Accessori

Bestell-Nummer

Order No.

No. de commande

Codice articolo

Ersatzteile / Zubehör

Spare parts / Accessories

Pièces de rechange / access.

Parti di ricambio / Accessori

Verschlußschraube,  flach  mit 

O-Ring

Locking screw, flat with 

O-ring

Bouchon  fileté  avec  joint  to-

rique

Tappo a vite piano con 

O-ring

G 1/8

Adapter-Set für GW A2 mit 

Anschluß G 1/4

Adapter set for GW A2 fitted 

with G 1/4 port

Kit de montage GW A2 avec 

raccord taraudé G 1/4

Set adattatore per GW A2 con 

attacco G 1/4

MBC...

Leitungsdose, Schwarz

Line socket, black

Prise, noire

Spina, nera

GDMW, 3 pol. + E

Anschlußflansch

Connection flange

Bride de raccordement

Flangia di collegamento

MBC-300-... 

Rp 1/2

MBC-300-... 

Rp 3/4

MBC-300-... 

Rp 1

MBC-300-... 

Rp 1 1/4

MBC-700/1200-... 

Rp 1

MBC-700/1200-... 

Rp 1 1/4

MBC-700/1200-... 

Rp 1 1/2

MBC-700/1200-... 

Rp 2

O-Ring, EN geprüft 

(Set 2 Stück)

O-ring, EN tested 

(Set 2 pieces)

Joint torique, testé EN 

(Kit 2 pièces)

O-Ring, collaudato a norme 

EN (Set 2 pezzi)

MBC-300-... 

57 x 3,0

MBC-700/1200 

75 x 3,5

Zylinderschraube DIN 912, 8.8 

(Set 4 Stück)

Socket head screw acc.

DIN 912, 8.8 (Set 4 pieces)

Vis à tête cylindrique 

DIN 912, 8.8

(Kit 4 pièces)

Vite cilindrica DIN 912, 8.8

(Set 4 pezzi)

MBC-300-... 

M6 x 25

MBC-700/1200-...  M8 x 35

Meßstutzen mit Dichtring

Instrument gland with sealing 

ring

Goujon de mesure

Raccordo di misura con anello 

di tenuta

G 1/8

G 1/4

Bestell-Nummer

Order No.

No. de commande

Codice articolo

230 432

222 982

210 319

222 341

222 342

222 001

240 506

222 343

222 344

221 884

221 926

230 443

230 444

010 272

248 410

219 008

022 335

Summary of Contents for 241 484

Page 1: ...nformit Notice d utilisation Dichiarazione di conformit Istruzioni di esercizio e di montaggio MBC SE N GasMultiBloc Servodruckregler GasMultiBloc Servopressure Regulator MultiBloc Pressostat ser voco...

Page 2: ...ssion 2014 68 UE Directive CEM 2014 30 UE Directive basse tension 2014 35 UE Tous les composants homolo gu s conform ment la directive sur les dispositifs sous pression sont des l ments d quipement fo...

Page 3: ...rding to the Pressure Equipment Safety Regulations 2016 are equipment parts with safety function In the event of an alteration of the equipment not approved by us this declaration loses its validity T...

Page 4: ...a norme EN 88 Un AC 230 V 15 10 oder or ou o AC 100 V 120 V DC 48 V DC 24 V 28 V Einschaltdauer Switch onduration Dur edemisesoustension Durata inserzione 100 Umgebungstemperatur Ambient temperature...

Page 5: ...6 5 1 5 1 5 1 5 1 16 8 16 8 16 8 Einbauma e Dimensions Cotes d encombrement Dimensioni mm b 143 143 143 143 176 176 176 176 261 261 261 c 61 61 61 61 80 80 80 80 96 96 96 d 175 175 175 175 187 187 18...

Page 6: ...ehen Please use proper tools Tighten screws crosswise Utiliser des outils adapt s Serrer les vis en croisant Impiegare gli attrezzi adeguati Stringere le viti secondo uno schema a croce DN Rp Mmax Tma...

Page 7: ...lvole DIN EN 175 301 803 nero Flangia in entrata Attacco pressione G 1 8 prima del filtro Filtro Targhetta Coperchio Attacco misuratore G 1 8 possibile sui due lati prima della V1 Attacco misuratore G...

Page 8: ...and functional test 5 Disassembly in reverse order 3 2 1 Version brides taraud es MBC Montage D montage 1 Visserlesbridessurlatuyauterie utiliser de la p te joints appro pri e Fig 1 2 Mise en place d...

Page 9: ...rtes possible Uncontr led tanch it des conduites sera r alis apr s le montage Attention dans l utilisa tiond unsprayded tectiondefuite Pression de contr le pmax 100 mbar 1 pe Gaseingangsdruck SE S22 8...

Page 10: ...sible in operation Fig 1 3 Checkignitionreliabilityofburner 4 If necessary repeat settings Check intermediate values 5 Seal setting screw see below Ensure optimum combustion and ignition reliability M...

Page 11: ...pressione nominale prescritto agendosullarotelladella scala graduata Prestare attenzione alle istruzioni indicate dal fa bbricante del bruciatore Il pressostato scatta con pressione in discesa regolaz...

Page 12: ...ins une fois par an Changer le filtre lorsque le p entre les prises de pression 1 et 2 10 mbar Changer le filtre lorsque le p entre les prises de pression 1 et 2 adoubl depuisladerni remesure 1 Interr...

Page 13: ...g 4 6 ReplacecoverB tightenbyhand Fig 5 Remplacement de la bobine MBC 300 700 1 Couper l arriv e du gaz et l alimentation lectrique 2 Enlever le couvercle B Fig 1 3 Desserrer le contre crou A Fig 2 4...

Page 14: ...aimant MBC 1200 1 Interromprel arriv edegaz couper l alimentation en courant 2 Desserrer la vis de blocage A fig 1 3 Retirer le couvercle B fig 2 4 Soulever avec pr caution le couvercle d aimant fig...

Page 15: ...pparecchio in condizioni gi preregolate con filtro fine Vn m3 h Erdgas Natural gas Gaz Naturel Gas metano dv 0 65 Vn m3 h Luft Air Aria dv 1 00 2 3 4 5 6 7 8 910 20 30 40 60 80 100 200 2 3 4 5 6 7 8 9...

Page 16: ...n filtro fine MBC 1200 Durchflu Diagramm1 Flow Diagram1 Courbe des d bits 1 Diagramma di portata 1 Kurven f r Ger teauswahl im eingeregelten Zustand mit Feinfilter Curves for equipment selection in re...

Page 17: ...e piano con O ring G 1 8 Adapter Set f r GW A2 mit Anschlu G 1 4 Adapter set for GW A2 fitted with G 1 4 port Kit de montage GW A2 avec raccord taraud G 1 4 Set adattatore per GW A2 con attacco G 1 4...

Page 18: ...rect entre le MBC et la ma onnerie les cloisons en b ton et planchers en cours de s chage Prot ger les surfaces de brides Serrer les vis en croi sant Seul du personnel sp cialis peut effectuer des tra...

Page 19: ...rm Standard Norme Norma Dauerhafte Lagertemperatur Permanent storage temperature Temp rature de stockage permanent Temperatura di stoccaggio permanente Zyklenzahl Operating cycles Cycle d op ration Nu...

Page 20: ...ngs com Internet www dungs com Karl Dungs GmbH Co KG Karl Dungs Platz 1 D 73660 Urbach Germany Telefon 49 7181 804 0 Telefax 49 7181 804 166 Hausadresse Head Offices and Factory UsineetServicesAdminis...

Reviews: