background image

3

Installation and Operation of: 

FlexBake 5™ Integrated Ventilation System

In addition to the warnings and cautions in this manual, use the following guidelines for 

safe operation of the unit.

•  Read all instructions before using equipment.
•  For your safety, the equipment is furnished with a properly grounded cord connector. Do  
  not attempt to remove or disconnect the grounded connector.
•  Install or locate the equipment only for its intended use as described in this manual. 
•  Do not use corrosive chemicals on this equipment.
•  Do not operate this equipment if it has a damaged cord or plug, if it is not working  

 

  properly, or if it has been damaged or dropped.
•  This equipment should be serviced by qualified personnel only. Contact the nearest   

 

  Duke authorized service facility for adjustment or repair.
•  Do not block or cover any openings on the unit.
•  Do not immerse cord or plug in water.
•  Keep cord away from heated surfaces.
•  Do not allow cord to hang over edge of table or counter.
•  A minimum clearance of 6” (152,4 mm) from the top of the unit to the ceiling must be 

provided.

The following warnings and cautions appear throughout this manual and should be 

carefully observed.

•  Turn the unit off, disconnect the power source and allow unit to cool down before   

 

  performing any service or maintenance on the unit.
•  The procedures in this manual may include the use of chemical products. You must read   
  the Material Safety Data Sheets before using any of these products. 
•  The unit should be grounded according to local electrical codes to prevent the  

 

 

  possibility of electrical shock. It requires a grounded receptacle with dedicated electrical   
  lines, protected by fuses or circuit breaker of the proper rating, in accordance with all  

 

  applicable regulations.
•  Disposal of the unit must be in accordance with local environmental codes and/or any    
  other applicable codes.
•  This appliance is not intended for use by persons (including children) with reduced  

 

  physical, sensory or mental capabilities, or lack of experience and knowledge, unless  

 

  they have been given supervision or instruction concerning use of the appliance    

 

  by a person responsible for their safety.

Summary of Contents for FlexBake 5 IVS-208-FB5

Page 1: ...al is Copyright 2019 Duke Manufacturing Co All rights reserved Reproduction without written permission is prohibited Duke is a registered trademark of the Duke Manufacturing Co CAUTION Please read thi...

Page 2: ...rmation Indicates electrical shock hazard which if not avoided could result in death or serious injury and or equipment damage Indicates hot surface which if not avoided could result in minor or moder...

Page 3: ...unter A minimum clearance of 6 152 4 mm from the top of the unit to the ceiling must be provided The following warnings and cautions appear throughout this manual and should be carefully observed Turn...

Page 4: ...5 37 2 94 6 34 6 87 9 164 61 2 Inches 40 5X37 1X14 2 CM 102 9X94 2X36 1 Inches 45 5X42 3X21 5 CM 115 6X107 4X54 6 IVS CE FB5 78 5 199 5 37 2 94 6 34 6 87 9 164 61 2 Inches 40 5X37 1X14 2 CM 102 9X94 2...

Page 5: ...Cool Down Drip Valve ORN BLK WHT BLK YEL Top Vent Blower BLK PUR Bottom Vent Damper BLK PUR BLK 208V RED 230V WHT COM WIRING SCHEMATIC Oven Conv Blower WHT BLK 9 8 7 6 5 4 3 2 1 YEL BLU BLK ORN WHT P...

Page 6: ...Remove the 4 wood screws 2 per side flange securing the IVS assembly to the wooden slats and pallet Carefully remove any blocking and lift the IVS out of the carton and inspect for any shipping damage...

Page 7: ...the Vent Box Remove the Facade Vent Box SAVE NUTS Step 6 Remove the Facade Back Panel by removing the 7 Tek screws and the 4 8 32 screws SAVE SCREWS Step 7 Remove the 6 Tek screws along each side pane...

Page 8: ...ep 2 Install the IVS Vent Box supplied and Venturi removed in previous Step 4 with 4 8 32 screws NOTE With the Back Panel loosely attached ensure all holes are aligned to prevent cross threading or bi...

Page 9: ...ecure the IVS duct to the oven exhaust duct Step 8 Install the 6 screws 3 per side Tek screws previously removed in Step 7 Step 9 Connect the IVS assembly blower motor to the oven harness IVS Blower M...

Page 10: ...perly in place Step 14 Align the IVS Cover holes and install the 14 screws 8 32 to secure it Step 15 Connect the IVS blower outlet as required per local codes and or other applicable codes using 5 rig...

Page 11: ...t the local electrical codes and shall be of sufficient length to allow the equipment to be moved for cleaning IMPORTANT A minimum clearance of 6 from the top of unit to the ceiling must be provided C...

Page 12: ...ched vent piping CARE AND CLEANING ELECTRICAL SHOCK HAZARD DO NOT WASH WITH WATER JET OR HOSE DO NOT USE OVEN CLEANERS CAUSTIC CLEANERS DEGREASERS ACIDS AMMONIA PRODUCTS ABRASIVE CLEANERS STEEL WOOL O...

Reviews: