8
Installation and Operation of:
FlexBake 5™ Integrated Ventilation System
INSTALLATION OF NEW IVS HOOD
Step 1
Install the IVS Back Panel loosely with the 7 screws
(Tek screws previously removed in Step 6.), as
shown. Make sure the ring gaskets are applied to
both sides of this panel.
Step 2
Install the IVS Vent Box (supplied) and Venturi
(removed in previous Step 4.) with 4 (#8-32)
screws.
NOTE: With the Back Panel loosely
attached, ensure all holes are
aligned to prevent cross threading or
binding.
Step 3
Install the IVS Vent Box Cover with 9 (#8-32)
screws.
Step 4
Install the 4 (1/4-20 nuts) to secure the Vent Box
and Back Panel assembly to the Cool-down blower
housing tabs.
Step 5
Place the new Exhaust Duct Gasket (supplied with
the IVS assembly) onto the Exhaust Duct flange.