15
Installation and Operation of Flexible Batch Broiler – Electric
C-2. Daily Cleaning
Daily cleaning should also include all items listed in the 4 hour cleaning schedule.
2
1
3
2
1
2
1
1
2
2
1
1
2
LOADER – Slide out
LOADER TRAY – Dislodge and pull out
MAIN GREASE PAN – Slide out
"V" GREASE PAN – Slide out
PHU PAN SHELF – Slide up and out
DISCHARGE HOOD – Slide up and out
DISCHARGE GREASE PAN
Tilt up, un-hook and pull forward. Discharge
grease into an approved oil collection system.
DISCHARGE PAN HOLDER – Slide up and out